External Factors of Delay that Affect the Performance of International Construction Contractors in Kuwait

被引:0
|
作者
Hamouda, Ahmed Atif Hussein [1 ]
机构
[1] Univ Liverpool, Liverpool L69 3BX, Merseyside, England
关键词
Project delay; international contractors; delay factors; construction industry; PROJECTS;
D O I
10.30880/ijscet.2021.11.04.003
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As the construction industry in Kuwait develops, the need for international contractors to handle and manage these projects rises as well. Currently, 70% of the projects in Kuwait get delayed, some by internal factors, and some by external ones. Thus, the purpose of this research is to provide a framework for international construction contractors in Kuwait regarding the external factors of delay that they might face in their projects. External factors of delay are a newly generated type of delays that represent all the delays that are beyond the contractor's control and cannot be anticipated in the project. In this research, the most important and frequently occurring external factors of delay were extracted and discussed with 15 project management professionals to elaborate their perspectives and construct a survey to evaluate the impact and frequency of these delaying factors in the construction industry in Kuwait. This survey was distributed to 80 project management practitioners; then, the outcomes were analyzed by using the Relative Importance Index methodology to rank the effect of the examined delaying factors. Hence this research will provide international construction contractors with an illustration of the delaying factors that they should focus on and the ones they can pay less attention to them.
引用
收藏
页码:18 / 33
页数:16
相关论文
共 50 条
  • [1] External Factors of Delay That Affect the Performance of International Construction Contractors in Kuwait
    Hamouda, Ahmed Atif Hussein
    [J]. INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2020, 12 (08): : 8 - 19
  • [2] Factors effecting construction contractors' performance
    Assaf, SA
    AlHammad, AM
    Ubaid, A
    [J]. BUILDING RESEARCH AND INFORMATION, 1996, 24 (03): : 159 - 163
  • [3] Factors affecting the safety performance of contractors and construction sites
    Wong, KW
    Chan, PC
    Lo, KK
    [J]. IMPLEMENTATION OF SAFETY AND HEALTH ON CONSTRUCTION SITES, 1999, : 19 - 24
  • [4] Understanding the competitiveness factors of Korean contractors in the international construction market
    Whang, Seoung-Wook
    Flanagan, Roger
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (09) : 911 - 920
  • [5] Bid/no-bid decision factors for Chinese international contractors in international construction projects
    Li, Guanghua
    Chen, Chuan
    Zhang, Guomin
    Martek, Igor
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (07) : 1619 - 1643
  • [6] Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam
    Thong Quoc Vu
    Cuong Phu Pham
    Thu Anh Nguyen
    Phong Thanh Nguyen
    Phuong Thanh Phan
    Quyen Le Hoang Thuy To Nguyen
    [J]. JOURNAL OF ASIAN FINANCE ECONOMICS AND BUSINESS, 2020, 7 (09): : 389 - 400
  • [7] Exploring Critical Factors Affecting Contractors' Coopetition Relationship in International Construction Projects
    Gao, Lili
    Deng, Xiaopeng
    Yang, Weimin
    Chang, Tengyuan
    [J]. ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [8] Factors Affecting International Contractors' Performance in the 21st Century
    Gunhan, Suat
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2020, 25 (04)
  • [9] CONTRACTORS CONSTRUCTION CLAIM BARRED BY NO DAMAGE FOR DELAY CLAUSE
    HOLLAND, JK
    [J]. WATER-ENGINEERING & MANAGEMENT, 1992, 139 (02): : 8 - 9
  • [10] Institutional Factors Impacting on International Construction Market Selection: Evidence from Chinese Contractors
    Li, Liping
    Martek, Igor
    Chen, Chuan
    [J]. BUILDINGS, 2022, 12 (05)