Factors affecting the quality of software project management: An empirical study based on the Capability Maturity Model

被引:9
|
作者
McGuire, EG [1 ]
机构
[1] AMERICAN UNIV,WASHINGTON,DC 20016
关键词
software process improvement; quality; change management;
D O I
10.1007/BF00209188
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Rigorous project management can help raise a software product development process from an initial, immature stage that is unstable and unrepeatable to an optimized maturity level characterized by continuous improvement and innovation. Goals and actions related to a repeatable project management process have been outlined in the Capability Maturity Model (CMM) developed by the Software Engineering Institute at Carnegie Mellon University. The CMM provides good guidelines for initiating software process improvement particularly in the project management area; however, the successful implementation of the CMM guidelines is often not accomplished without significant organizational change involving increased emphasis on change management, teams and employee empowerment. This paper is empirically based on observations, surveys, and interviews of project team managers and project team members in a large, multinational organization. The focus of the paper is on the development of a project management process that emphasizes project planning, change management, quality management, team work, and process control. Findings presented in this paper are correlated with the CMM guidelines as well as organizational factors that were found to enable or impede the successful deployment of various aspects of a project management improvement plan. The role of education and training in process and quality techniques as well as project management tools that support group work is also examined. This paper provides some insight into the issues faced by organizations based on traditional hierarchy or matrix management as they attempt to move into a more process-driven, quality-oriented development environment. As organizations move towards global markets they need increased emphasis on quality, value, teams, standards and global project management strategies based on structured guidelines to handle process how within and between projects, departments, organizations, and national boundaries.
引用
收藏
页码:305 / 317
页数:13
相关论文
共 50 条
  • [1] Factors affecting the quality of software project management: An empirical study based on the Capability Maturity Model
    McGuire, EG
    [J]. SOFTWARE QUALITY MANAGEMENT IV - IMPROVING QUALITY, 1996, : 211 - 225
  • [2] Factors Affecting the Transition Time Between Capability Maturity Model Integration (CMMI) Levels in Software Industry of Pakistan: An Empirical Study
    Riaz, Muhammad Noman
    [J]. 2017 INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGIES (ICICT), 2017, : 90 - 96
  • [3] Software quality and the Capability Maturity Model
    Herbsleb, J
    Zubrow, D
    Goldenson, D
    Hayes, W
    Paulk, M
    [J]. COMMUNICATIONS OF THE ACM, 1997, 40 (06) : 30 - 40
  • [4] The Role of Software Configuration Management and Capability Maturity Model in System Quality
    Shaikh, Zaffar Ahmed
    Wagan, Asif Ali
    Laghari, Asif Ali
    Ali, Karar
    Memon, Mashooq Ahmed
    Sathio, Anwar Ali
    [J]. INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2019, 19 (11): : 114 - 119
  • [5] The Design of Capability Maturity Model of IT Project Management Based on ERP
    Tan, Aiping
    Zhang, Yinghui
    Liu, Mingli
    [J]. MECHATRONICS AND INTELLIGENT MATERIALS, PTS 1 AND 2, 2011, 211-212 : 656 - 660
  • [6] Software project management maturity assessment model to assess software project management practices
    Fauzi, Shukor Sanim Bin Mohd
    Ramli, Nuraminah Bt
    [J]. ICCSA 2007: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND APPLICATIONS, 2007, : 375 - +
  • [7] HCI in practice: An empirical study with software process capability maturity model consultants in Brazil
    Goncalves, Taisa Guidini
    de Oliveira, Kathia Marcal
    Kolski, Christophe
    [J]. JOURNAL OF SOFTWARE-EVOLUTION AND PROCESS, 2018, 30 (11)
  • [8] Study on a Maturity Model of Project Management Capability for a Large Aircraft Main Manufacturer
    GAO Zhi
    YE Jin-fu
    HU Qi-bo
    [J]. International Journal of Plant Engineering and Management, 2014, 19 (01) : 52 - 60
  • [9] Project management capability levels: An empirical study
    McBride, T
    Henderson-Sellers, B
    Zowghi, D
    [J]. 11TH ASIA-PACIFIC SOFTWARE ENGINEERING CONFERENCE, PROCEEDINGS, 2004, : 56 - 63
  • [10] Software reuse management: Development of a model in the context of the capability maturity model
    Vadapalli, A
    Nazareth, DL
    [J]. ASSOCIATION FOR INFORMATION SYSTEMS PROCEEDINGS OF THE AMERICAS CONFERENCE ON INFORMATION SYSTEMS, 1998, : 903 - 905