Modeling Road Construction Project Cost in the Philippines Using the Artificial Neural Network Approach

被引:0
|
作者
Roxas, Cheryl Lyne C. [1 ]
Roxas, Nicanor R., Jr. [2 ]
Cristobal, Jerald [1 ]
Hao, Sara Eunice [1 ]
Rabino, Rochelle Marie [1 ]
Revalde, Fulgencio, Jr. [1 ]
机构
[1] De La Salle Univ, Civil Engn Dept, Taft Ave Malate, Manila, Philippines
[2] De La Salle Univ, Mfg Engn & Management Dept, Taft Ave Malate, Manila, Philippines
关键词
REGRESSION-ANALYSIS; MULTIPLE-REGRESSION;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Incomplete data and several unforeseen factors affect the accuracy of project cost estimates, especially during the conceptualization stage. When stakeholders need an immediate estimate of the budget for a project, in-depth cost analysis may take time, sacrificing resources for feasibility studies. In the Philippines, a more effective and efficient early cost estimation method is recommended to ensure proper utilization of government funds. In this paper, the artificial neural network technique was adopted to model the local total road project cost. Data collection included 41 road projects with each having 15 factors were recorded, namely: road type, location (region), length of road, duration of project, capacity, pavement thickness, pavement width, shoulder width, earthworks volume, average site clearing/grubbing area, presence of water body, soil conditions, surface class, gross domestic product and consumer price index. After correlation analysis, 7 input variables were finalized. These are the soil condition, surface class, gross domestic product, presence of water body, pavement width, road type and capacity. Several simulations were performed in MATLAB software to determine the best total road project cost model. The best neural network architecture consists of 7 input variables, 12 neurons in the hidden layer and 1 output variable. This neural network model satisfactorily predicted the total cost with coefficient of correlation values of 0.97168, 0.95188, and 0.99036 for training, validation and testing phases, respectively.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Cost estimation in road construction using artificial neural network
    Ksenija Tijanić
    Diana Car-Pušić
    Marija Šperac
    Neural Computing and Applications, 2020, 32 : 9343 - 9355
  • [2] Cost estimation in road construction using artificial neural network
    Tijanic, Ksenija
    Car-Pusic, Diana
    Sperac, Marija
    NEURAL COMPUTING & APPLICATIONS, 2020, 32 (13): : 9343 - 9355
  • [3] Construction Project Cost and Duration Optimization Using Artificial Neural Network
    Gopal, M.
    Kumar, D. Rupesh
    AEI 2015: BIRTH AND LIFE OF THE INTEGRATED BUILDING, 2015, : 433 - 444
  • [4] Construction project cost forecasting method based on artificial neural network model
    Cuilan, Fang, 1600, Academy of Sciences of the Czech Republic, Dolejskova 5, Praha 8, 182 00, Czech Republic (62):
  • [5] A global modeling approach using artificial neural network
    Goasguen, S
    Hammadi, SM
    El-Ghazaly, SM
    1999 IEEE MTT-S INTERNATIONAL MICROWAVE SYMPOSIUM DIGEST, VOLS 1-4, 1999, : 153 - 156
  • [6] Research on the Cost Estimation Method of Construction Project Based on RBF Artificial Neural Network
    Mo, Jun-wen
    Yin, Yi
    Wu, Hai-long
    INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC AND INFORMATION TECHNOLOGY (ICMEIT 2018), 2018, : 629 - 632
  • [7] Prediction of cost and duration of building construction using artificial neural network
    Ujong J.A.
    Mbadike E.M.
    Alaneme G.U.
    Asian Journal of Civil Engineering, 2022, 23 (7) : 1117 - 1139
  • [8] MODELING OF PAVEMENT ROUGHNESS UTILIZING ARTIFICIAL NEURAL NETWORK APPROACH FOR LAOS NATIONAL ROAD NETWORK
    Gharieb, Mohamed
    Nishikawa, Takafumi
    Nakamura, Shozo
    Thepvongsa, Khampaseuth
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (04) : 261 - 277
  • [9] Construction labor production rates modeling using artificial neural network
    Muqeem, Sana
    Idrus, Arazi
    Khamidi, M. Faris
    Bin Ahmad, Jale
    Bin Zakaria, Saiful
    Electronic Journal of Information Technology in Construction, 2011, 16 : 713 - 726
  • [10] CONSTRUCTION LABOR PRODUCTION RATES MODELING USING ARTIFICIAL NEURAL NETWORK
    Muqeem, Sana
    Idrus, Arazi
    Khamidi, M. Faris
    Bin Ahmad, Jale
    Bin Zakaria, Saiful
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2011, 16 : 713 - 725