共 48 条
- [1] Preparing for New MISO Ancillary-Service Market: FirstEnergy Perspectives [J]. 2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 3360 - 3361
- [2] Optimizing FirstEnergy assets in MISO market [J]. 2006 IEEE/PES POWER SYSTEMS CONFERENCE AND EXPOSITION. VOLS 1-5, 2006, : 554 - +
- [3] Experience with operating the ancillary-service markets in ERGOT [J]. 2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10, 2007, : 4576 - +
- [4] Experience with operating genco assets in Ontario market [J]. 2006 IEEE/PES Power Systems Conference and Exposition. Vols 1-5, 2006, : 561 - 562
- [5] Experience with operating genco assets in RTO markets [J]. 2006 IEEE/PES Power Systems Conference and Exposition. Vols 1-5, 2006, : 551 - 552
- [6] New Ancillary Service Market for ERCOT [J]. IEEE ACCESS, 2020, 8 (178391-178401): : 178391 - 178401
- [7] Market mode and pricing method for ancillary service market of operating reserve in China [J]. Dianli Xitong Zidonghue/Automation of Electric Power Systems, 2000, 24 (09):
- [8] Experience with managing generating assets and demand in the MISO day-2 market [J]. 2006 IEEE/PES Power Systems Conference and Exposition. Vols 1-5, 2006, : 553 - 553
- [9] Scheduling energy and ancillary service in the new Ontario Electricity Market [J]. PICA 2001: 22ND IEEE POWER ENGINEERING SOCIETY INTERNATIONAL CONFERENCE ON POWER INDUSTRY COMPUTER APPLICATIONS, 2001, : 161 - 165