Scheduling a batch processing machine with non-identical job sizes

被引:42
|
作者
Azizoglu, M
Webster, S [1 ]
机构
[1] Syracuse Univ, Sch Management, Syracuse, NY 13244 USA
[2] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
关键词
D O I
10.1080/00207540050028034
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The problem of scheduling batch processors is important in some industries and, at a more fundamental level, captures an element of complexity common to many practical scheduling problems. We describe a branch and bound procedure applicable to a batch processor model with arbitrary job processing times, job weights and job sizes. The scheduling objective is to minimize total weighted completion time. We find that the procedure returns optimal solutions to problems of up to similar to 25 jobs in reasonable CPU time, and can be adapted for use as a heuristic for larger problems.
引用
收藏
页码:2173 / 2184
页数:12
相关论文
共 50 条
  • [1] Scheduling a batch processing machine with non-identical job sizes: a clustering perspective
    Chen, Huaping
    Du, Bing
    Huang, George Q.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (19) : 5755 - 5778
  • [2] Fuzzy Scheduling for Single Batch-processing Machine with Non-identical Job Sizes
    Cheng, Ba-yi
    Chen, Hua-ping
    Wang, Shuan-shi
    [J]. 2008 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-5, 2008, : 27 - 30
  • [3] Minimising makespan heuristics for scheduling a single batch machine processing machine with non-identical job sizes
    Lee, Yoon Ho
    Lee, Young Hoon
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3488 - 3500
  • [4] Earliness-tardiness minimization on scheduling a batch processing machine with non-identical job sizes
    Li, Zhongya
    Chen, Huaping
    Xu, Rui
    Li, Xueping
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 87 : 590 - 599
  • [5] Scheduling a single batch processing machine with non-identical two-dimensional job sizes
    Zhou, Shengchao
    Jin, Mingzhou
    Liu, Chuang
    Zheng, Xu
    Chen, Huaping
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2022, 201
  • [6] Scheduling unrelated parallel batch processing machines with non-identical job sizes
    Li, XiaoLin
    Huang, YanLi
    Tan, Qi
    Chen, HuaPing
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (12) : 2983 - 2990
  • [7] Scheduling batch processing machine problem with non-identical job sizes via artificial immune system
    Chung, Tsui-Ping
    Sun, Heng
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2018, 35 (03) : 129 - 134
  • [8] Improved MILP formulation equipped with valid inequalities for scheduling a batch processing machine with non-identical job sizes
    Kashan, Ali Husseinzadeh
    Ozturk, Onur
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2022, 112
  • [9] A tabu search heuristic to solve the scheduling problem for a batch-processing machine with non-identical job sizes
    Meng, Ying
    Tang, Lixin
    [J]. PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1703 - 1707
  • [10] Batch scheduling on uniform parallel machines with non-identical job sizes
    Li, Xiao-Lin
    Du, Bing
    Xu, Rui
    Chen, Hua-Ping
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (01): : 102 - 110