Pb Recycling Through Leaching, Precipitation, and Cementation from Zinc Plant Residue

被引:1
|
作者
Taheri, Behrouz [1 ]
Gharabaghi, Mahdi [1 ]
Aghazadeh, Sajjad [1 ]
机构
[1] Univ Tehran, Sch Min Engn, Coll Engn, Tehran 1439957131, Iran
关键词
Zinc; Lead; ZPR; Precipitation; Cementation;
D O I
10.1007/s40831-021-00338-2
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents the hydrometallurgical methods used for the recovery of concentrate and metallic lead from zinc plant residue (ZPR). The ZPR mainly consisting of 9.5% Pb and 7.5% Zn was initially leached by sulfuric acid under the following conditions: leaching temperature 90 degrees C, leaching time 90 min., sulfuric acid concentration 200 g/l, and solid/liquid ratio 1/5. The zinc recovery obtained was 92.8%, which was finally directed to solvent extraction circuit to produce zinc cathode. Then acidic residue was subjected to alkaline leaching, using sodium hydroxide (NaOH). The lead recovery obtained was 92.58%. For precipitation method by using NaClO, the effects of three important factors including (NaClO/solution) ratio, temperature, and precipitation time were studied and reported. As a result, lead was precipitated in the form of PbO2 with concentrated grade of 72.03% and recovery of 92.31%. Furthermore, aluminum was used for cementation process to produce metallic Pb with grade of 96.11% and total recovery of 87.17%.
引用
收藏
页码:291 / 299
页数:9
相关论文
共 50 条
  • [1] Pb Recycling Through Leaching, Precipitation, and Cementation from Zinc Plant Residue
    Behrouz Taheri
    Mahdi Gharabaghi
    Sajjad Aghazadeh
    Journal of Sustainable Metallurgy, 2021, 7 : 291 - 299
  • [2] Recycling lead from a zinc plant residue (ZPR) using brine leaching and cementation with aluminum powder
    Motamedizadeh, Moslem
    Azizi, Asghar
    Bahri, Zahra
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (31) : 42121 - 42134
  • [3] Recycling lead from a zinc plant residue (ZPR) using brine leaching and cementation with aluminum powder
    Moslem Motamedizadeh
    Asghar Azizi
    Zahra Bahri
    Environmental Science and Pollution Research, 2021, 28 : 42121 - 42134
  • [4] Recovery of Lead from Zinc Plant Residue by Alkaline Leaching Process Followed by Cementation
    Kim, Jonghyun
    Kim, Min-seuk
    Chung, Kyeong Woo
    Kurniawan
    Lee, Jae-chun
    9TH INTERNATIONAL SYMPOSIUM ON LEAD AND ZINC PROCESSING, PBZN 2020, 2020, : 253 - 263
  • [5] Recycling Zinc from Metal Oxide Varistors Through Leaching and Cementation of Cobalt and Nickel
    Gutknecht, Toni
    Colombus, Yuda
    Steenari, Britt-Marie
    JOURNAL OF SUSTAINABLE METALLURGY, 2017, 3 (02) : 239 - 250
  • [6] Recycling Zinc from Metal Oxide Varistors Through Leaching and Cementation of Cobalt and Nickel
    Toni Gutknecht
    Yuda Colombus
    Britt-Marie Steenari
    Journal of Sustainable Metallurgy, 2017, 3 : 239 - 250
  • [7] KINETICS OF Pb AND Zn LEACHING FROM ZINC PLANT RESIDUE BY SODIUM HYDROXIDE
    Erdem, M.
    Yurten, M.
    JOURNAL OF MINING AND METALLURGY SECTION B-METALLURGY, 2015, 51 (01) : 89 - 95
  • [8] Alkaline Leaching and Concurrent Cementation of Dissolved Pb and Zn from Zinc Plant Leach Residues
    Silwamba, Marthias
    Ito, Mayumi
    Hiroyoshi, Naoki
    Tabelin, Carlito Baltazar
    Hashizume, Ryota
    Fukushima, Tomoki
    Park, Ilhwan
    Jeon, Sanghee
    Igarashi, Toshifumi
    Sato, Tsutomu
    Nyambe, Imasiku
    Nakata, Hokuto
    Nakayama, Shouta
    Ishizuka, Mayumi
    MINERALS, 2022, 12 (04)
  • [9] Recycling lead from copper plant residue (CPR) using brine leaching – Precipitation - Calcination process
    Li C.
    Li S.
    Guo P.
    Li Y.
    Liu X.
    Chemosphere, 2023, 345
  • [10] ACIDIC LEACHING OF CADMIUM FROM ZINC PLANT RESIDUE
    Gharabaghi, Mahdi
    Irannajad, Mehdi
    Azadmehr, Amir Reza
    PHYSICOCHEMICAL PROBLEMS OF MINERAL PROCESSING, 2011, 47 : 91 - 104