共 50 条
- [2] Residual life assessment of F12 main steam pipe system in thermo-power plant [J]. Tongji Daxue Xuebao, 2008, 1 (86-91):
- [3] Determining the residual service life of the steam lines at the Estonia thermal power station [J]. Teploenergetika, 2002, (04): : 70 - 74
- [4] Modeling of Main Steam Parameters in Large Thermal Power Plant [J]. 2016 3RD INTERNATIONAL CONFERENCE ON MECHANICS AND MECHATRONICS RESEARCH (ICMMR 2016), 2016, 77
- [5] Cause Analysis and Solution of Main Steam Pipe Vibration in a Nuclear Power Plant [J]. Zhan, Minming (zhanminming@snerdi.com.cn), 1600, Atomic Energy Press (42): : 138 - 142
- [8] Remaining lifetime assessment of power plant steam boilers [J]. BALTICA VIII: LIFE MANAGEMENT AND MAINTENANCE FOR POWER PLANTS, VOL 2, 2010, 265 : 167 - 175
- [10] STEAM TEMPERATURE PREDICTION CONTROL FOR THERMAL POWER-PLANT [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1984, 103 (09): : 2382 - 2387