Research on temporary plugging refracturing technology for shale gas wells

被引:5
|
作者
Xiao, B. [1 ]
Jiang, T. X. [1 ]
Ding, S. D. [1 ]
Chen, Z. [1 ]
Zhang, X. D. [1 ]
Li, K. D. [2 ]
机构
[1] SINOPEC Inst Petr Engn, Beijing 100101, Peoples R China
[2] SINOPEC Jianghan Oilfield Co, Res Inst Petr Engn Technol, Wuhan 430035, Peoples R China
关键词
D O I
10.1088/1755-1315/510/2/022023
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
According to the variation law of stress induced by hydraulic fractures during the initial fracturing of shale gas wells, the temporary plugging refracturing technology was studied. Based on the research on the mechanism of fracture reorientation from temporary plugging, the process parameters (such as the particle size combination of the temporary plugging agent, the temporary plugging timing, and the amount of temporary plugging agent) were optimized, and the key material for temporary plugging were evaluated. Temporary plugging refracturing technology suitable for shale gas horizontal well was initially formed. Excellent results of trial test were achieved and the production rate after refracturing was increased by 5 times compared with that before stimulation. This study can provide some reference for temporary plugging refracturing of shale gas wells.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Staged fracturing of horizontal shale gas wells with temporary plugging by sand filling
    Liang X.
    Zhu J.
    Shi X.
    Zhang J.
    Liu C.
    He F.
    Li R.
    Natural Gas Industry, 2017, 37 (01) : 82 - 89
  • [2] Mechanism of migration and settlement for temporary plugging ball in shale gas horizontal wells
    Zhang, Feng
    Li, Kuidong
    Xiao, Jialin
    Liu, Wei
    Hu, Yun
    2020 6TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, PTS 1-5, 2020, 546
  • [3] Optimized multi-stage dual temporary plugging fracturing technology in deep shale gas horizontal wells
    Jiang T.
    Wang H.
    Zhao J.
    Zuo L.
    Bian X.
    Li S.
    Xiao B.
    Ren L.
    Natural Gas Industry, 2023, 43 (11) : 100 - 108
  • [4] Simulation and optimization of fracture pattern in temporary plugging fracturing of horizontal shale gas wells
    Chang, Xin
    Wang, Xingyi
    Yang, Chunhe
    Guo, Yintong
    Wei, Kai
    Hu, Guang
    Jiang, Chengbai
    Li, Qiang
    Dou, Ruijie
    FUEL, 2024, 359
  • [5] Research and Evaluation of a Nanometer Plugging Agent for Shale Gas Horizontal Wells
    Tian, Yuexin
    Liu, Xiangjun
    Liu, Yintao
    Dong, Haifeng
    Zhang, Guodong
    Su, Biao
    Yang, Xiaoli
    Huang, Jinjun
    Liang, Lixi
    Xiong, Jian
    Zhuo, Xiao
    ACS OMEGA, 2024, 9 (42): : 42698 - 42708
  • [6] Optimization method of refracturing timing for old shale gas wells
    Wang, Qiang
    Zhao, Jinzhou
    Hu, Yongquan
    Li, Yongming
    Wang, Yufeng
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2024, 51 (01) : 213 - 222
  • [7] Optimization method of refracturing timing for old shale gas wells
    WANG Qiang
    ZHAO Jinzhou
    HU Yongquan
    LI Yongming
    WANG Yufeng
    Petroleum Exploration and Development, 2024, 51 (01) : 213 - 222
  • [8] Theory and method of temporary macrofracture plugging to prevent casing deformation in shale gas horizontal wells
    Tong H.
    Liu Z.
    Zhang H.
    Zhang P.
    Deng C.
    Ren X.
    Xiao K.
    Zhou Y.
    Natural Gas Industry, 2021, 41 (05) : 92 - 100
  • [9] Pumps, refracturing hike production from tight shale gas wells
    Reeves, Scott R.
    Morrison, William K.
    Hill, David G.
    Oil and Gas Journal, 1993, 91 (05): : 35 - 38
  • [10] Refracturing shale gas wells in China: Doubling water consumption for enhanced gas recovery
    Shi, Wenrui
    Li, Jianfeng
    Huang, Zisang
    Feng, Yijiang
    Hong, Pu
    Lei, Shaojia
    Wu, Yi
    Wang, Jianliang
    Guo, Meiyu
    SCIENCE OF THE TOTAL ENVIRONMENT, 2024, 946