A Company's Readiness For Concurrent Product And Process Development

被引:0
|
作者
Zargi, Urban
Kusar, Janez [1 ]
Berlec, Tomaz [1 ]
Starbek, Marko [1 ]
机构
[1] Univ Ljubljana, Fac Mech Engn, Ljubljana 61000, Slovenia
来源
关键词
manufacturing; work organisation; product development; optimisation; management;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
When entering the global market, companies encounter several clef long product development times, which are unacceptable for customers. It? order to overcome this problem, companies will have to make a shift from sequential to concurrent product development as soon as possible. This paper presents strategic management in product development: parallelness, standardisation and integration of product development processes. Furthermore, the changes required by a transition front sequential to concurrent product development are presented with respect to the organisation of processes, the organisation of work (team-work), IT and preparation of product documentation. The paper concludes with a case study: analysis regarding readiness for a transition to concurrent product development (capability and motivation for team-work, susceptibility to team-work dysfunctions) in a company which is a development supplier of components for automotive industry and a proposal of activities that will have to be carried out in the company before the transition to the concurrent product development is done. (C) 2009 Journal of Mechanical Engineering. All rights reserved.
引用
收藏
页码:427 / 437
页数:11
相关论文
共 50 条
  • [1] Concurrent engineering for product, process and market development
    Fukuda, S
    [J]. CONCURRENT ENGINEERING: THE WORLDWIDE ENGINEERING GRID, PROCEEDINGS, 2004, : 35 - 42
  • [2] Product Development Process Simulation for Concurrent Engineering
    吴祚宝
    [J]. High Technology Letters, 1996, (01) : 1 - 4
  • [3] A dynamic model of iterations in concurrent product development process
    Lin, Jun
    Chai, Kah Hin
    Wong, Yoke San
    Brombacher, Aarnout C.
    [J]. PROCEEDINGS OF THE 2005 CONFERENCE OF SYSTEM DYNAMICS AND MANAGEMENT SCIENCE, VOL 2: SUSTAINABLE DEVELOPMENT OF ASIA PACIFIC, 2005, : 614 - 620
  • [4] Modeling and optimization of process of product development in concurrent engineering
    Dong, ZB
    Yan, JW
    Wu, QD
    [J]. PROCEEDINGS OF THE 3RD WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-5, 2000, : 2132 - 2136
  • [5] Coordination Model for the Concurrent Enginering Product Development Process
    熊光楞
    常天庆
    [J]. High Technology Letters, 1998, (02) : 3 - 10
  • [6] A concurrent workflow management process for integrated product development
    Prasad, B
    Wang, FJ
    Deng, JT
    [J]. JOURNAL OF ENGINEERING DESIGN, 1998, 9 (02) : 121 - 135
  • [7] Concurrent product and process development for metal forming operations
    Echempati, Raghu
    Waldron, William K., Jr.
    [J]. TOOLS AND METHODS OF COMPETITIVE ENGINEERING Vols 1 and 2, 2004, : 1101 - 1102
  • [8] Research on DSM for simulation of concurrent product development process
    Qian, X. M.
    Tang, D. B.
    [J]. MATERIALS AND PRODUCT TECHNOLOGIES, 2008, 44-46 : 595 - 600
  • [9] An experience in combining flexibility and control in a small company's software product development process
    Rautiainen, K
    Vuornos, L
    Lassenius, C
    [J]. 2003 INTERNATIONAL SYMPOSIUM ON EMPIRICAL SOFTWARE ENGINEERING, PROCEEDINGS, 2003, : 28 - 37
  • [10] Managing the risk aspects of the product development process at the Upjohn Company
    Katsanis, Lea
    Pitta, Dennis
    [J]. JOURNAL OF PRODUCT AND BRAND MANAGEMENT, 2006, 15 (04): : 250 - +