Decreasing the passenger waiting time for an intercity rail network

被引:85
|
作者
Vansteenwegen, P. [1 ]
Van Oudheusden, D. [1 ]
机构
[1] Katholieke Univ Leuven, Ctr Ind Beleid, B-3001 Louvain, Belgium
关键词
running time supplements; robustness; linear programming; timetabling; railway transfers;
D O I
10.1016/j.trb.2006.06.006
中图分类号
F [经济];
学科分类号
02 ;
摘要
To improve the robustness of timetables for a network of passenger train services, this paper seeks to minimize a waiting cost function that includes running time supplements and different types of waiting times and late arrivals. The approach is applied to the whole intercity (IC) network of the Belgian railways. The IC network consists of 14 fast trains connecting all major cities in Belgium. In the first phase of the approach, ideal running time supplements are calculated to safeguard connections when the feeder train is late. These supplements are based on the delay distributions of the trains, the passenger counts and on the weighting of different types of waiting times. In a second phase, continuous Linear Programming (LP) is used to construct an improved timetable with well-scheduled connections and, whenever possible, with ideal running time supplements. Simulation evaluates different timetables and makes further improvement of the LP timetable possible. For the case of the IC network, the final result is a timetable with suitable transfer times and a waiting cost, that is, 40% lower than the current timetable. Since continuous LP modelling is applied, the proposed technique is very promising for developing better timetables - even for very extensive railway networks. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:478 / 492
页数:15
相关论文
共 50 条
  • [1] STRATEGIC CAPACITY PLANNING PROCESS FOR INTERCITY PASSENGER RAIL
    Lai, Yung-Cheng
    Shih, Mei-Cheng
    [J]. PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 2, 2010, : 427 - 433
  • [2] DEVELOPMENTS TOWARDS FASTER INTERCITY PASSENGER RAIL TRANSPORTATION
    HANNA, AN
    [J]. MECHANICAL ENGINEERING, 1973, 95 (10) : 74 - 74
  • [3] EXAMINING INTERCITY RAIL PASSENGER STATION ACCESS PATTERNS
    Sperry, Benjamin R.
    Warner, Jeffery E.
    [J]. PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE 2012, 2012, : 555 - 562
  • [4] Economic Impacts of Intercity Passenger Rail Service Evidence from Passenger Surveys
    Sperry, Benjamin R.
    Morgan, Curtis A.
    [J]. TRANSPORTATION RESEARCH RECORD, 2011, (2261) : 25 - 30
  • [5] Timetable Optimization for Metro Lines Connecting to Intercity Railway Stations to Minimize Passenger Waiting Time
    Bai, Yun
    Hu, Qianyun
    Ho, Tin Kin
    Guo, Haiyang
    Mao, Baohua
    [J]. IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2021, 22 (01) : 79 - 90
  • [6] Prediction model of Passenger Waiting Time in High-speed Rail Hub Based on BP Neural Network
    Yu-Long Pei
    Kan Zhou
    Ting Peng
    [J]. MECHATRONICS AND INDUSTRIAL INFORMATICS, PTS 1-4, 2013, 321-324 : 1903 - 1906
  • [7] Renewal and Development of Intercity Passenger Rail System A Case of China
    Ou, Xinquan
    Zhang, Guohua
    Chang, Xiao Yun
    [J]. TRANSPORTATION RESEARCH RECORD, 2016, (2546) : 53 - 59
  • [8] Improving Intercity Passenger Rail Planning using Evidence from Passenger Survey Data
    Sperry, Benjamin R.
    Collins, Tyler
    [J]. TRANSPORTATION RESEARCH RECORD, 2018, 2672 (10) : 236 - 246
  • [9] Optimizing total passenger waiting time in an urban rail network: A passenger flow guidance strategy based on a multi-agent simulation approach
    Lei, Yuanzheng
    Lu, Gongyuan
    Zhang, Hongxiang
    He, Bisheng
    Fang, Jiaxin
    [J]. SIMULATION MODELLING PRACTICE AND THEORY, 2022, 117
  • [10] Intercity Passenger Rail Access to Airports Case Study in Milwaukee, Wisconsin
    Sperry, Benjamin R.
    Larson, Shawn
    Leucinger, David
    Janowiak, Scott
    Morgan, Curtis A.
    [J]. TRANSPORTATION RESEARCH RECORD, 2012, (2300) : 22 - 30