共 50 条
- [1] Composite heuristic algorithm for permutation flowshop scheduling problems with total flowtime minimization [J]. PROCEEDINGS OF THE 2008 12TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS I AND II, 2008, : 903 - +
- [2] A Genetic Algorithm for Permutation Flowshop Scheduling With Total Flowtime Criterion [J]. 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 1514 - +
- [4] Similarity Based Ant-colony Algorithm for Permutation Flowshop Scheduling Problems with Total Flowtime Minimization [J]. 2009 13TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, 2009, : 582 - +
- [5] An iterated local search algorithm for distributed permutation flowshop group scheduling problems with total flowtime minimization [J]. 2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 2003 - 2008
- [7] An efficient heuristic approach to total flowtime minimization in permutation flowshop scheduling [J]. The International Journal of Advanced Manufacturing Technology, 2008, 38 : 1018 - 1025
- [8] An efficient heuristic approach to total flowtime minimization in permutation flowshop scheduling [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 38 (9-10): : 1018 - 1025
- [10] Hybrid Genetic-VNS algorithm with total flowtime minimization for the no-wait flowshop problem [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 935 - +