Biochemical removal of nitrogen from tannery wastewater: performance and stability of a full-scale plant

被引:19
|
作者
Szpyrkowicz, L
Kaul, SN
机构
[1] Univ Venice, Dept Environm Studies, I-30123 Venice, Italy
[2] Natl Environm Engn Res Inst, Wastewater Technol Dept, Nagpur 440020, Maharashtra, India
关键词
tannery wastewater; full-scale plant performance; nitrification; denitrification; inhibition;
D O I
10.1002/jctb.1064
中图分类号
Q81 [生物工程学(生物技术)]; Q93 [微生物学];
学科分类号
071005 ; 0836 ; 090102 ; 100705 ;
摘要
This paper describes the performance of a full-scale common effluent plant treating tannery wastewater, based on a single-sludge nitrification/denitrification process, with the objective of investigating the reasons for its instability. The plant was monitored over a 1.5-year period; operational parameters were evaluated daily and their impact on process rates assessed together with the characteristics of the wastewater sampled at different points in the treatment scheme. The results showed that instability problems and a periodic failure of nitrification/denitrification occurred due to a series of reasons, often persisting simultaneously and having an additive synergetic effect. Factors whose magnitude would be insufficient to affect the performance of a plant treating domestic wastewater, eg; small deviations from the optimal pH in nitrification or denitrification basins, a temperature decrease to 17degreesC or an increase of the influent nitrogen content, caused the plant's efficiency to drop from 100% to 40% in some periods. To ensure stable performance, the dilution rate, D, along with the sludge retention time were shown to be key parameters for the control of the process. Maintaining values of D considerably lower than critical theoretical values calculated from the specific growth rate of nitrifiers at a given temperature and sludge recycle ratio may prevent problems in the plant's performance, particularly when high fluctuations of the concentration of inflow solids make calculation of the sludge age uncertain and proper sludge management difficult. (C) 2004 Society of Chemical Industry.
引用
收藏
页码:879 / 888
页数:10
相关论文
共 50 条
  • [1] Biochemical removal of nitrogen from industrial effluents: A full scale plant performance and stability
    Szpyrkowicz, L
    Kaul, SN
    [J]. NEW HORIZONS IN BIOTECHNOLOGY, 2003, : 271 - 284
  • [2] Intensified nitrogen removal by endogenous denitrification in a full-scale municipal wastewater treatment plant
    Li, Jia
    Wang, Yayi
    Liu, Jie
    Peng, Yongzhen
    Zhang, Liang
    Lin, Jia
    [J]. ENVIRONMENTAL RESEARCH, 2022, 205
  • [3] Optimization of the intermittent aeration in a full-scale wastewater treatment plant biological reactor for nitrogen removal
    Habermeyer, P
    Sánchez, A
    [J]. WATER ENVIRONMENT RESEARCH, 2005, 77 (03) : 229 - 233
  • [4] Nitrogen Removal in a Full-Scale Domestic Wastewater Treatment Plant with Activated Sludge and Trickling Filter
    Nourmohammadi, Davood
    Esmaeeli, Mir-Bager
    Akbarian, Hossein
    Ghasemian, Mohammad
    [J]. JOURNAL OF ENVIRONMENTAL AND PUBLIC HEALTH, 2013, 2013
  • [5] Optimization of a full-scale Unitank wastewater treatment plant for biological phosphorus removal
    Zhou, Zhen
    Xing, Can
    Wu, Zhichao
    Tong, Fei
    Wang, Junru
    [J]. ENVIRONMENTAL TECHNOLOGY, 2014, 35 (06) : 766 - 772
  • [6] Biological Phosphorus Removal Characteristics in a Full-scale Unitank Wastewater Treatment Plant
    Zhou, Zhen
    Shao, Wenrui
    Xing, Can
    Li, Zheng
    Guan, Pengqiong
    Zhou, Tao
    Wei, Zichao
    [J]. PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-4, 2013, 610-613 : 1696 - 1700
  • [7] Performance and microbial diversity of a full-scale oilfield wastewater treatment plant
    Xu, Lian-hua
    Tan, Zihang
    Zhang, Chunfang
    Liu, Yuhui
    Li, Cong
    Zhang, Xianzhe
    Wu, Jiaping
    Xie, Qinglin
    [J]. DESALINATION AND WATER TREATMENT, 2017, 99 : 239 - 247
  • [8] Performance evaluation of SBR treatment for nitrogen removal from tannery wastewater
    Murat, S.
    Insel, G.
    Artan, N.
    Orhon, D.
    [J]. WATER SCIENCE AND TECHNOLOGY, 2006, 53 (12) : 275 - 284
  • [9] Full-scale experience for nitrogen removal from piggery waste
    Choi, E
    Kim, D
    Eum, Y
    Yun, Z
    Min, KS
    [J]. WATER ENVIRONMENT RESEARCH, 2005, 77 (04) : 381 - 389
  • [10] Enhancing nitrogen removal efficiency in a dyestuff wastewater treatment plant with the IFFAS process: the pilot-scale and full-scale studies
    Mao, Yanjun
    Quan, Xie
    Zhao, Huimin
    Zhang, Yaobin
    Chen, Shuo
    Liu, Tao
    [J]. WATER SCIENCE AND TECHNOLOGY, 2018, 77 (01) : 70 - 78