Disassembly Sequence Planning Considering Fuzzy Component Quality and Varying Operational Cost

被引:204
|
作者
Tian, Guangdong [1 ,2 ]
Zhou, MengChu [3 ,4 ]
Li, Peigen [1 ]
机构
[1] Huazhong Univ Sci & Technol, State Key Lab Digital Mfg Equipment & Technol, Wuhan 430074, Hubei, Peoples R China
[2] Jilin Univ, Transportat Coll, Changchun 130022, Jilin, Peoples R China
[3] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
[4] King Abdulaziz Univ, Renewable Energy Res Grp, Jeddah, Saudi Arabia
基金
中国国家自然科学基金;
关键词
Disassembly; disassembly planning; fuzzy simulation; modeling and simulation; BEE COLONY ALGORITHM; REASONING PETRI NETS; REMANUFACTURING INDUSTRY; UNCERTAINTY MANAGEMENT; OPTIMIZATION; DESIGN; MODEL; METHODOLOGY; STRATEGIES; PARAMETERS;
D O I
10.1109/TASE.2017.2690802
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Disassembly planning aims to search the best disassembly sequences of a given obsolete/used product in terms of economic and environmental performances. A practical disassembly process may face great uncertainty owing to various unpredictable factors. To handle it, researchers have addressed the stochastic cost and time problems of product disassembly. In reality, the uncertain environment of product disassembly is associated with both randomness and fuzziness. Besides uncertain disassembly cost and time, the quality of disassembled components/parts in a process has uncertainty and thus needs to be assessed via expert opinions/subjects. To do so, this paper presents a new AND/OR-graph-based disassembly sequence planning problem by considering uncertain component quality and varying disassembly operational cost. Important disassembly planning models are built on the basis of different disassembly criteria. A novel hybrid intelligent algorithm integrating fuzzy simulation and artificial bee colony is proposed to solve them. Its effectiveness is well illustrated through several numerical cases and comparison with a prior method, i.e., fuzzy-simulation-based genetic algorithm. Note to Practitioners-This paper deals with the uncertainty management problem of product disassembly. It builds some fuzzy programming models for product disassembly and proposes a hybrid intelligent algorithm integrating fuzzy simulation and artificial bee colony to solve them. Previously, such a problem was handled through a methodology based on stochastic planning, which was ineffective without considering the fuzzy characteristic of completing a disassembly task. The goal of this paper is to analyze the disassembly uncertainty feature from the perspective of fuzzy programming. Both theoretical and simulation results demonstrate that the proposed approach is highly effective. The obtained results can help decision-makers better determine a disassembly process of a used/returned/obsolete product.
引用
收藏
页码:748 / 760
页数:13
相关论文
共 36 条
  • [1] Selective Asynchronous Parallel Disassembly Sequence Planning Considering Indeterminate Degree of Disassembly
    Guo, Jun
    Wang, Zhendong
    Du, Baigang
    Li, Yibing
    [J]. Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2021, 32 (09): : 1080 - 1090
  • [2] Research of Fuzzy cost model for selective disassembly planning
    Zhou, Ziqiang
    Dai, Guohong
    Wu, Zhaoren
    [J]. RESEARCH IN MATERIALS AND MANUFACTURING TECHNOLOGIES, PTS 1-3, 2014, 835-836 : 1732 - +
  • [3] Robotic disassembly sequence planning considering parts failure features
    Cui, Jia
    Yang, Can
    Zhang, Jinliang
    Tian, Sisi
    Liu, Jiayi
    Xu, Wenjun
    [J]. IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2023, 5 (01)
  • [4] Disassembly Sequence Planning Considering Human-Robot Collaboration
    Lee, Meng-Lun
    Behdad, Sara
    Liang, Xiao
    Zheng, Minghui
    [J]. 2020 AMERICAN CONTROL CONFERENCE (ACC), 2020, : 2438 - 2443
  • [5] Partial disassembly sequence planning based on cost-benefit analysis
    Smith, Shana
    Hsu, Li-Yen
    Smith, Gregory C.
    [J]. JOURNAL OF CLEANER PRODUCTION, 2016, 139 : 729 - 739
  • [6] Robotic Disassembly Sequence Planning Considering Robotic Collision Avoidance Trajectory in Remanufacturing
    Chen, Binbin
    Xu, Wenjun
    Liu, Jiayi
    Ji, Zhenrui
    Zhou, Zude
    [J]. 2020 IEEE 18TH INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS (INDIN), VOL 1, 2020, : 494 - 501
  • [7] Sequence Planning Considering Human Fatigue for Human-Robot Collaboration in Disassembly
    Li, Kai
    Liu, Quan
    Xu, Wenjun
    Liu, Jiayi
    Zhou, Zude
    Feng, Hao
    [J]. 11TH CIRP CONFERENCE ON INDUSTRIAL PRODUCT-SERVICE SYSTEMS, 2019, 83 : 95 - 104
  • [8] Fuzzy-Petri-net based disassembly planning considering human factors
    Tang, Y
    Zhou, MC
    [J]. 2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 4195 - 4200
  • [9] Fuzzy-clustering based cost modeling of disassembly planning for EOL products
    School of Mechanical Engineering, Changshu Institute of Technology, Changshu
    Jiangsu, China
    不详
    不详
    [J]. Open Mech. Eng. J., 1 (546-551):
  • [10] Disassembly Sequence Planning of Product Structure With an Improved QICA Considering Expert Consensus for Remanufacturing
    Feng, Yixiong
    Cui, Kaiyue
    Hong, Zhaoxi
    Li, Zhiwu
    Yan, Weiyu
    Tan, Jianrong
    [J]. IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2023, 19 (05) : 7201 - 7213