A continuity method for bridges constructed with precast prestressed concrete girders

被引:3
|
作者
Lee, HW
Barnes, RW
Kim, KY
机构
[1] Pukyong Natl Univ, Dept Civil Engn, Pusan 608739, South Korea
[2] Auburn Univ, Dept Civil Engn, Auburn, AL 36849 USA
[3] Pukyong Natl Univ, Dept Civil Engn, Pusan 608739, South Korea
关键词
bridge; continuity method; prestressed concrete; secondary moment; staged prestressing; structural efficiency; U-girder;
D O I
10.12989/sem.2004.17.6.879
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A method of making simply supported girders continuous is described for bridges with spans of 30-45 m. The splicing method takes advantage of an induced secondary moment to transform the self-weight stresses in the precast simply supported girders into values representative of a continuous girder. Them secondary moment results from prestressing of continuity tendons and detensioning of temporary tendons in the girders. Preliminary sections are selected for spliced U-girder bridges with a range of span lengths. Use of the proposed technique results in girder depth reductions of 500-800 mm when compared to standard simply Supported I-girder bridges. The flexural behavior of an example bridge with 40-m spans is examined to illustrate the necessary considerations for determining the optimum sequence of splicing operations.
引用
收藏
页码:879 / 898
页数:20
相关论文
共 50 条
  • [1] DESIGN OF CONTINUOUS HIGHWAY BRIDGES WITH PRECAST PRESTRESSED CONCRETE GIRDERS
    FREYERMU.CL
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1969, 14 (02): : 14 - &
  • [2] Proper detailing of precast/prestressed concrete girders
    Birkle, G
    [J]. PCI JOURNAL, 2005, 50 (05): : 118 - +
  • [3] Proper detailing of precast/prestressed concrete girders
    Birkle, G
    Tadros, M
    Tadros, M
    [J]. PCI JOURNAL, 2005, 50 (06): : 110 - 111
  • [4] Stress Redistribution in Prestressed Concrete Bridges Built with Ultra-Thin Precast Girders
    Suza, Dominik
    Kollegger, Johann
    [J]. CONCREEP 10: MECHANICS AND PHYSICS OF CREEP, SHRINKAGE, AND DURABILITY OF CONCRETE AND CONCRETE STRUCTURES, 2015, : 640 - 648
  • [5] Resolving restraint moments: Designing for continuity in precast prestressed concrete girder bridges
    McDonagh, MD
    Hinkley, KB
    [J]. PCI JOURNAL, 2003, 48 (04): : 104 - +
  • [6] Nonlinear continuity analysis of precast, prestressed concrete girders with cast-in-place decks and diaphragms
    Mirmiran, A
    Kulkarni, S
    Castrodale, R
    Miller, R
    Hastak, M
    [J]. PCI JOURNAL, 2001, 46 (05): : 60 - +
  • [7] Effects of Temperature Variations on Precast, Prestressed Concrete Bridge Girders
    Barr, P. J.
    Stanton, J. F.
    Eberhard, M. O.
    [J]. JOURNAL OF BRIDGE ENGINEERING, 2005, 10 (02) : 186 - 194
  • [8] The effect of temperature variations on the camber of precast, prestressed concrete girders
    Nguyen, Hang
    Stanton, John
    Eberhard, Marc
    Chapman, David
    [J]. PCI Journal, 2015, 60 (05): : 48 - 64
  • [9] The effect of temperature variations on the camber of precast, prestressed concrete girders
    Hang Nguyen
    Stanton, John
    Eberhard, Marc
    Chapman, David
    [J]. PCI JOURNAL, 2015, : 48 - 64
  • [10] Fabrication and design of Precambered precast, prestressed concrete bridge girders
    Brice, Richard
    Seguirant, Stephen J.
    Mizumori, Anthony
    Khaleghi, Bijan
    [J]. PCI JOURNAL, 2020, 65 (03): : 64 - 77