Pressure Regulation with Kick Attention in a Managed Pressure Drilling System

被引:8
|
作者
Zhou, Jing [1 ]
Stamnes, Oyvind Nistad [2 ]
Aamo, Ole Morten [2 ]
Kaasa, Glenn-Ole [3 ]
机构
[1] Int Res Inst Stavanger, Petr Dept, NO-5008 Bergen, Norway
[2] Norwegian Univ Sci & Technol, Dept Engn Cyberent, NO-7491 Trondheim, Norway
[3] Statoilhydro ASA Res Ctr, NO-3908 Porsgrunn, Norway
关键词
Managed pressure drilling; adaptive observer; pressure control; kick detection;
D O I
10.1109/CDC.2009.5400792
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a switched control scheme for regulation of the annular pressure in a well during drilling. The main feature is automatic kick attenuation while drilling reservoir sections. A simple mathematical model is presented that captures the dominant phenomena of the drilling system and forms the basis for observer and control design. A switched pressure control algorithm for feedback control of the choke valve opening and the back-pressure pump is proposed, and asymptotic stability properties are established. Kick attenuation is guaranteed for a set of reservoir models, including the most common ones. As part of the control scheme, novel observers for estimation of the flow rate through the bit and kick/loss detection are developed. Simulation results obtained with a high fidelity drilling simulator are presented to demonstrate the effectiveness of the proposed switched control scheme.
引用
收藏
页码:5586 / 5591
页数:6
相关论文
共 50 条
  • [1] Switched Control for Pressure Regulation and Kick Attenuation in a Managed Pressure Drilling System
    Zhou, Jing
    Stamnes, Oyvind Nistad
    Aamo, Ole Morten
    Kaasa, Glenn-Ole
    [J]. IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2011, 19 (02) : 337 - 350
  • [2] Adaptive Observer for Kick Detection and Switched Control for Bottomhole Pressure Regulation and Kick Attenuation during Managed Pressure Drilling
    Zhou, Jing
    Nygaard, Gerhard
    Godhavn, John-Morten
    Breyholtz, Oyvind
    Vefring, Erlend H.
    [J]. 2010 AMERICAN CONTROL CONFERENCE, 2010, : 3765 - 3770
  • [3] Early Detection and Estimation of Kick in Managed Pressure Drilling
    Habib, M. Musab
    Imtiaz, Syed
    Khan, Faisal
    Ahmed, Salim
    Baker, Justin
    [J]. SPE DRILLING & COMPLETION, 2021, 36 (02) : 245 - 262
  • [4] Nonlinear model predictive control of gas kick in a managed pressure drilling system
    Sule, Idris
    Imtiaz, Syed
    Khan, Faisal
    Butt, Stephen
    [J]. JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2019, 174 : 1223 - 1235
  • [5] Kick control reliability analysis of managed pressure drilling operation
    Sule, Idris
    Khan, Faisal
    Butt, Stephen
    Yang, Ming
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2018, 52 : 7 - 20
  • [6] Kick detection and remedial action in managed pressure drilling: a review
    Huque, Mohammad Mojammel
    Imtiaz, Syed
    Rahman, Aziz
    Hossain, Mohamed
    [J]. SN APPLIED SCIENCES, 2020, 2 (07)
  • [7] Kick detection and remedial action in managed pressure drilling: a review
    Mohammad Mojammel Huque
    Syed Imtiaz
    Aziz Rahman
    Mohamed Hossain
    [J]. SN Applied Sciences, 2020, 2
  • [8] Robust controller design for automated kick handling in managed pressure drilling
    Aarsnes, Ulf Jakob F.
    Acikmese, Behcet
    Ambrus, Adrian
    Aamo, Ole Morten
    [J]. JOURNAL OF PROCESS CONTROL, 2016, 47 : 46 - 57
  • [9] Nonlinear Model Predictive Controller for Kick Attenuation in Managed Pressure Drilling
    Nandan, Anirudh
    Imtiaz, Syed
    [J]. IFAC PAPERSONLINE, 2016, 49 (07): : 248 - 253
  • [10] A dynamic managed pressure well-control method for rapid treatment of gas kick in deepwater managed pressure drilling
    Yang, Hong-Wei
    Li, Jun
    Jiang, Ji-Wei
    Zhang, Hui
    Guo, Bo-Yun
    Zhang, Geng
    Chen, Wang
    [J]. PETROLEUM SCIENCE, 2022, 19 (05) : 2297 - 2313