Parametric Analysis on Incrementally Launched Construction for Concrete Box Girder

被引:2
|
作者
Wang, Yajun [1 ]
Dai, Jie [1 ]
Qin, Fengjiang [1 ]
机构
[1] Changan Univ, Xian 710064, Peoples R China
关键词
Bridge engineering; Box girder; Launching nose; Incrementally launched method; Parametric analysis;
D O I
10.4028/www.scientific.net/AMR.838-841.231
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The structural behavior of incrementally launched bridges in the construction stages depends on different parameters. Internal force of main girder is influenced by the dead load and stiffness of main girder, the length and stiffness of launching nose. Parametric analysis on the effect of internal force of an 8x60m-span concrete continuous box girder bridge was carried out. The results show that bending moment increases following the increase of weight and stiffness of corresponding segment of main girder. The phenomenon is even more obvious in the negative bending moment region of main girder segment nearby the launching nose. The bending moment of main girder reduces significantly when the stiffness ratio among launching nose and main girder is less than 0.15. While, the negative bending moment of main girder reduces significantly when the length ratio among launching nose and main span is more than 0.58.
引用
收藏
页码:231 / 236
页数:6
相关论文
共 50 条
  • [1] BRIDGE REDESIGNED AS INCREMENTALLY LAUNCHED BOX GIRDER
    不详
    [J]. JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1977, 74 (04): : N25 - N26
  • [2] Analysis of curved incrementally launched box concrete bridges using the Transfer Matrix Method
    Arici, M.
    Granata, M. F.
    [J]. BRIDGE STRUCTURES, 2007, 3 (3-4) : 165 - 181
  • [3] Parametric Analysis of Temperature Gradient about Concrete Box Girder
    Li, Jianqiang
    Liu, Hongbin
    [J]. ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4, 2013, 291-294 : 1144 - 1148
  • [4] Transfer matrix method for construction phase analysis of incrementally launched prestressed concrete bridges
    Sasmal, Saptarshi
    Ramanjaneyulu, K.
    [J]. ENGINEERING STRUCTURES, 2006, 28 (13) : 1897 - 1910
  • [5] ANALYSIS OF INCREMENTALLY LAUNCHED BRIDGES: A PARAMETRIC MATRIX BASED STUDY
    Shojaei, Arman
    Riahi, Hossein Tajmir
    Fini, Siavash Haji Akbari
    [J]. INTERNATIONAL JOURNAL OF BRIDGE ENGINEERING, 2014, 2 (01): : 17 - 42
  • [6] Construction equipment for concrete box girder bridges
    Levintov, Boris
    [J]. Concrete International, 1995, 17 (02): : 43 - 47
  • [7] A parametric study of curved incrementally launched bridges
    Granata, Michele Fabio
    Margiotta, Piercarlo
    Arici, Marcello
    [J]. ENGINEERING STRUCTURES, 2013, 49 : 373 - 384
  • [8] Application of High Performance Concrete in the Construction of Box Girder
    You, Qiyong
    Yang, Hongyong
    [J]. ADVANCES IN TEXTILE ENGINEERING AND MATERIALS III, PTS 1 AND 2, 2013, 821-822 : 1219 - +
  • [9] TRANSVERSE ANALYSIS OF CONCRETE BOX GIRDER BRIDGES
    SHUSHKEWICH, KW
    [J]. CIVIL ENGINEERING FOR PRACTICING AND DESIGN ENGINEERS, 1985, 4 (12): : 995 - 1027
  • [10] APPROXIMATE ANALYSIS OF CONCRETE BOX GIRDER BRIDGES
    SHUSHKEWICH, KW
    [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1988, 114 (07): : 1644 - 1657