共 50 条
- [1] A hybrid discrete firefly algorithm for multi-objective flexible job shop scheduling problem with limited resource constraints [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (9-12): : 1567 - 1579
- [2] A hybrid discrete firefly algorithm for multi-objective flexible job shop scheduling problem with limited resource constraints [J]. The International Journal of Advanced Manufacturing Technology, 2014, 72 : 1567 - 1579
- [6] Hybrid Ant Colony Multi-Objective Optimization for Flexible Job Shop Scheduling Problems [J]. JOURNAL OF INTERNET TECHNOLOGY, 2010, 11 (03): : 361 - 369
- [7] A hybrid algorithm for multi-objective job shop scheduling problem [J]. 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3630 - 3634
- [8] An effective hybrid algorithm for multi-objective flexible job-shop scheduling problem [J]. ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (09):
- [9] Hybrid Evolutionary Algorithm for Multi-Objective Job Shop Scheduling [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING AND INTELLIGENT SYSTEMS, PROCEEDINGS, VOL 2, 2009, : 168 - +
- [10] Optimization of multi objective Job Shop Scheduling problems using Firefly algorithm [J]. ADVANCED MANUFACTURING RESEARCH AND INTELLIGENT APPLICATIONS, 2014, 591 : 157 - +