Construction waste generation estimates of institutional building projects: Leveraging waste hauling tickets

被引:39
|
作者
Bakchan, Amal [1 ]
Faust, Kasey M. [2 ]
机构
[1] Univ Texas Austin, Dept Civil Architectural & Environm Engn, 301 E Dean Keeton St C1752, Austin, TX 78712 USA
[2] Univ Texas Austin, Dept Civil Architectural & Environm Engn, Construct Engn & Project Management Program, 301 E Dean Keeton St C1752, Austin, TX 78712 USA
关键词
Construction waste; Generation rates; Hauling tickets; Institutional building; DEMOLITION WASTE; ECONOMIC-FEASIBILITY; DEBRIS GENERATION; MANAGEMENT; MODEL;
D O I
10.1016/j.wasman.2019.02.024
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The large proportions of waste generated from the construction industry have led to adverse environmental and socio-economic impacts, and as such, there is a need to promote construction waste management (CWM) practices. However, there is limited information regarding construction waste (CW) generated from nonresidential buildings available to support such CWM practices. This study seeks to quantify CW generated from a nonresidential institutional building project using CW data collected from 535 waste hauling tickets. These tickets provide a waste generation summary itemized by various CW streams. The CW data was collected through coordination with the project waste management team. Findings reveal that concrete/masonry is the highest waste stream during the Foundation (46% of CW) and Structural Concrete (88% of CW) stages. During the Masonry Work and Finishing Stage, wood is found to be the primary contributor (54% of CW), followed by concrete/masonry (35.3% of CW). The estimated CW generation rate was approximately 69 kg/m(2) , with the concrete/masonry and wood waste streams having the highest generation rates of 33.61 kg/m(2) and 28.21 kg/m(2), respectively, comprising 90% of the total CW across the project. Due to the temporal characteristics of different waste streams, varying CW dumpsters available onsite is recommended based on the construction stage, to mitigate space short-age impacts. Furthermore, this study quantifies the benefits of recycling CW as environmental savings of trees, water, energy and greenhouse gas emissions. Findings of this study would help refine the accuracy of the reported estimates of CW generation for nonresidential construction projects. By shedding light on the corresponding handling practices of the generated waste and project management processes applied on institutional projects, the study can also serve as a guide to better plan for and coordinate the management of CW of these projects. Results may be used to promote and encourage the adoption of CWM practices at the site level to improve the sustainability performance of the construction industry. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:301 / 312
页数:12
相关论文
共 50 条
  • [1] Major factors contributing to the construction waste generation in building projects of Iraq
    Khaleel, Tareq
    Al-Zubaidy, Ahmed
    [J]. 3RD INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, BCEE3-2017, 2018, 162
  • [2] Exploring Waste Generation Mechanism for Construction Projects
    Li, Ya-shuai
    Zhang, Xue-qing
    Zhao, Qiu-hong
    [J]. 3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, ICCEASI 2015, 2015, : 355 - 358
  • [3] Impact of rework on material waste in building construction projects
    Mahamid, Ibrahim
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (08) : 1500 - 1507
  • [4] Construction Waste Generation in the Iranian Building Industry
    Eghbali, S. R.
    Araee, Azizzadeh R.
    Boushehri, Mofrad A.
    [J]. CIVIL ENGINEERING INFRASTRUCTURES JOURNAL-CEIJ, 2019, 52 (01): : 1 - 10
  • [5] Factors Contributing to the Waste Generation in Building Projects of Pakistan
    Memon, Nafees Ahmed
    Laghari, Muhammad Aslam
    Memon, Fareed Ahmed
    [J]. MEHRAN UNIVERSITY RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY, 2016, 35 (01) : 95 - 100
  • [6] Developing a quantitative construction waste estimation model for building construction projects
    Li, Yashuai
    Zhang, Xueqing
    Ding, Guoyu
    Feng, Zhouquan
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2016, 106 : 9 - 20
  • [7] IMPROVING PROJECT PERFORMANCE AND WASTE REDUCTION IN CONSTRUCTION PROJECTS: A CASE STUDY OF A GOVERNMENT INSTITUTIONAL BUILDING PROJECT
    Firmawan, Ferry
    Othman, Fadil
    Yahya, Khairulzan
    [J]. INTERNATIONAL JOURNAL OF TECHNOLOGY, 2012, 3 (02) : 182 - 192
  • [8] Methodology for upstream estimation of construction waste for new building projects
    Lam, Patrick T. I.
    Yu, Ann T. W.
    Wu, Zezhou
    Poon, Chi Sun
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 230 : 1003 - 1012
  • [9] Web-based construction waste estimation system for building construction projects
    Li, Yashuai
    Zhang, Xueqing
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 35 : 142 - 156
  • [10] Model for estimating construction waste generation in masonry building
    Nagalli, Andre
    de Carvalho, Karina Querne
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WASTE AND RESOURCE MANAGEMENT, 2019, 172 (01) : 28 - 36