Viaduct over River Ulla: An Outstanding Composite (Steel and Concrete) High-Speed Railway Viaduct

被引:3
|
作者
Millanes Mato, Francisco [1 ,2 ]
Ortega Cornejo, Miguel [1 ,3 ]
Matute Rubio, Luis [1 ,3 ]
机构
[1] IDEAM SA, Madrid, Spain
[2] Univ Politecn Madrid, Madrid, Spain
[3] Univ Europea Madrid, Madrid, Spain
关键词
high-speed railway bridge; double composite action (steel concrete); truss; launching; lifting; self-equilibrated cantilevers;
D O I
10.2749/101686614X13830788506279
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The viaduct over River Ulla is located in the Atlantic High Speed Railway Line between A Coruna and Pontevedra, in the northwest of Spain. Its location, close to the firth of Ulla, in a landscape of outstanding natural beauty and strong environmental constraints, was the object of a tender among the most renowned Spanish structural specialists. The solution chosen was a 1620 m long viaduct, with three main spans of 225 + 240 + 225 m and several approaching spans of 120 m length each, which meant a main span being about 20% longer than the Nantenbach bridge in Germany, the current world record in High Speed Railway composite steel and concrete truss girder beam bridges. The main spans have been designed with a double composite steel and concrete truss deck, with double composite action in hogging zones, and a total depth ranging from 9,15 m at the mid-span section to 17,90 m at the section over the piers. The adjacent spans that give access to the depth-varying main ones have been designed with constant depth. This article describes the structural conception of the bridge and the three different constructive processes that had to be used due to the access and the environmental restrictions.
引用
收藏
页码:131 / 136
页数:6
相关论文
共 50 条
  • [1] Viaduct over river Ulla: An outstanding composite (steel and concrete) high-speed railway Viaduct
    Mato, Francisco Millanes
    Cornejo, Miguel Ortega
    Rubio, Luis Matute
    [J]. Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 2014, 24 (01): : 131 - 136
  • [2] Viaduct over Ulla River in the Atlantic high speed railway line: A composite(steel- concrete) truss world record
    Millanes Mato, Francisco
    Ortega Cornejo, Miguel
    Estevez Sanchez, Ruben A.
    [J]. HORMIGON Y ACERO, 2015, 66 (277): : E1 - E25
  • [3] Influence of the Double Composite Action Solution in the Behavior of a High-Speed Railway Viaduct
    Peixer Miguel de Antonio, Marco Antonio
    Carvalho, Hermes
    Montenegro, Pedro Aires
    Correia, Jose Antonio
    Bittencourt, Tulio Nogueira
    Bartolo Calcada, Rui Artur
    Guo, Tong
    [J]. JOURNAL OF BRIDGE ENGINEERING, 2020, 25 (07)
  • [4] Arroyo Las Piedras Viaduct: The first composite steel-concrete high speed railway bridge in spain
    University Politécnica de Madrid
    不详
    不详
    不详
    [J]. Struct Eng Int J Int Assoc Bridge Struct Eng, 2007, 4 (292-297):
  • [5] Operationalmodal analysis of a high-speed railway bridge: the Jalon viaduct
    He, Leqia
    Qin, Shiqiang
    Bui, Tien-Thanh
    Reynders, Edwin
    Cuadrado, Manuel
    Museros, Pedro
    De Roeck, Guido
    [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON NOISE AND VIBRATION ENGINEERING (ISMA2012) / INTERNATIONAL CONFERENCE ON UNCERTAINTY IN STRUCTURAL DYNAMICS (USD2012), 2012, : 1073 - 1087
  • [6] Archidona Viaduct: Composite Steel-Concrete Deck for a Long Railway Bridge
    Millanes, Francisco
    Bordo Bujalance, Enrique
    Mansilla Dominguez, Juan Luis
    Martin Suarez, Jesus
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2014, 24 (01) : 122 - 126
  • [7] Viaduct over the River Deba on the 'Basque-y' high-speed rail line
    Millanes Mato, Francisco
    Ortega Cornejo, Miguel
    Ugarte Gonzalez, Jokin
    Solera Perez, Pablo
    Figueiredo, Helder
    [J]. HORMIGON Y ACERO, 2016, 67 (280): : 287 - 308
  • [8] A Novel Path Loss Model for High-Speed Railway Viaduct Scenarios
    He, Ruisi
    Zhong, Zhangdui
    Ai, Bo
    Xiong, Lei
    Wei, Hong
    [J]. 2011 7TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING (WICOM), 2011,
  • [9] Study on the Shadow Fading Characteristic in Viaduct Scenario of the High-speed Railway
    Wei, Hong
    Zhong, Zhangdui
    Xiong, Lei
    Ai, Bo
    He, Ruisi
    [J]. 2011 6TH INTERNATIONAL ICST CONFERENCE ON COMMUNICATIONS AND NETWORKING IN CHINA (CHINACOM), 2011, : 1216 - 1220
  • [10] Path Loss Models in Viaduct and Plain Scenarios of the High-speed Railway
    Wei, Hong
    Zhong, Zhangdui
    Guan, Ke
    Ai, Bo
    [J]. 2010 5TH INTERNATIONAL ICST CONFERENCE ON COMMUNICATIONS AND NETWORKING IN CHINA (CHINACOM), 2010,