I&C INTEGRATED TEST PHASE OF THE MOCHOVCE NUCLEAR POWER PLANT, UNITS 3 AND 4

被引:0
|
作者
Ciriello, Antonio [1 ]
Kuemmerling, Stefan [1 ]
机构
[1] Areva GmbH, Erlangen, Bavaria, Germany
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
This paper briefly introduces the safety instrumentation and control (I&C) system (Teleperm (R) XS) designed for the nuclear power plant in Mochovce units 3 and 4 (Slovak Republic). The overall I&C architecture of the concerned nuclear power plant is shortly introduced as well. An overview is given on the different test phases for the hardware and software I&C modules. The integrated I&C test concept and its implementation is presented as well as the description of the integrated test phase in the test bay in Erlangen (Germany). After a successful completion of the integrated test phase for unit 3, the Factory Acceptance Test (FAT) and the erection phase have been started for the concerned I&C safety systems (e.g., the Reactor Protection System and the Reactor Power Limitation System). This paper will also present the significant advantages and specifics of performing the concerned I&C tests in the aforementioned test bay.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] I&C Update on Plant Vogtle Units 3 and 4
    Flowers, James H.
    [J]. POWER, 2011, 155 (02) : 36 - 38
  • [2] The Independence of Safety Digital I&C System in Nuclear Power Plant
    Jia, Xiang
    Wang, Zhong-Qiu
    Zhang, Yun-Bo
    Guo, Yin-Hui
    [J]. NUCLEAR POWER PLANTS: INNOVATIVE TECHNOLOGIES FOR INSTRUMENTATION AND CONTROL SYSTEMS, 2017, 400 : 201 - 207
  • [3] Building of a CAD system for I&C system of nuclear power plant
    Ma, Zhi-Cai
    Zhang, Dong-Sheng
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2013, 34 (04): : 168 - 170
  • [4] Study on I&C Safety Classification Method of Nuclear Power Plant
    Fu, Tao
    He, Xiang-Jie
    Zhang, Long-Qiang
    [J]. NUCLEAR POWER PLANTS: INNOVATIVE TECHNOLOGIES FOR INSTRUMENTATION AND CONTROL SYSTEMS, 2018, 455 : 50 - 57
  • [5] EMI Analysis and Location of I&C Equipment in Nuclear Power Plant
    Huang, Su
    He, Xiaodong
    Han, Dadi
    Liu, Xinyuan
    Li, Benrong
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2023, 44 (01): : 171 - 176
  • [6] A Study on the Vulnerability Assessment for Digital I&C System in Nuclear Power Plant
    Kim, SungCheol
    Euom, IeckChae
    Ha, ChangHyun
    Lee, JooHyoung
    Noh, BongNam
    [J]. INFORMATION SECURITY APPLICATIONS, WISA 2018, 2019, 11402 : 68 - 80
  • [7] Applicability of AADL in modelling the overall I&C architecture of a nuclear power plant
    Linnosmaa, Joonas
    Pakonen, Antti
    Papakonstantinou, Nikolaos
    Karpati, Peter
    [J]. IECON 2020: THE 46TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, 2020, : 4337 - 4344
  • [8] APPLYING ENGINEERING SIMULATOR TO VERIFICATION AND VALIDATION OF DIGITAL I&C IN NUCLEAR POWER PLANT
    Lin, Meng
    Hou, Dong
    Yang, Zongwei
    Liu, Pengfei
    [J]. ICONE17, VOL 5, 2009, : 729 - 733
  • [9] RESEARCH ON ELECTRIC AND I&C EQUIPMENT SAFETY FUNCTION CLASSIFICATION OF NUCLEAR POWER PLANT
    Wang Yuqi
    Sun Qian
    [J]. PROCEEDINGS OF 2021 28TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE28), VOL 1, 2021,
  • [10] Analysis of Mal-Operation Accidents of Nuclear Power Plant I&C System
    Cai, Wei
    Bao, Guogang
    Yue, Zhidong
    Lu, Changdong
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2021, 42 (05): : 167 - 172