Determining and assessing the significant barriers of transferring unfinished construction projects from the public sector to the private sector in Iran

被引:6
|
作者
Sarvari, Hadi [1 ]
Nassereddine, Hala [2 ]
Chan, Daniel W. M. [3 ]
Amirkhani, Mohsen [1 ]
Md Noor, Norhazilan [4 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, Isfahan Khorasgan Branch, Esfahan, Iran
[2] Univ Kentucky, Dept Civil Engn, Lexington, KY USA
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Kowloon, Hong Kong, Peoples R China
[4] Univ Teknol Malaysia, Construct Res Ctr, Sch Civil Engn, Johor Baharu, Malaysia
来源
CONSTRUCTION INNOVATION-ENGLAND | 2021年 / 21卷 / 04期
关键词
Private sector; Public sector; Barriers; Construction projects; Infrastructure; Iran;
D O I
10.1108/CI-07-2020-0112
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose The government sometimes lacks sufficient financial, management and technical capabilities to deliver construction projects. As a result, it has recognized the need to introduce private sector capital and expertise to complete unfinished construction projects. This outsourcing paradigm is known as a public-private partnership, a form of privatization. This study aims to identify the barriers associated with the transfer of unfinished construction projects to the private sector in Iran and grouped them into areas that were ranked to shed light on where the risk lies. Design/methodology/approach After a thorough and comprehensive literature review, a questionnaire was developed and distributed to 67 experts in the public and private sectors in Iran. The survey included 37 barriers grouped into seven areas and measured on a five-point Likert scale. Face validity, content validity and structural validity of the collected data were confirmed. The reliability of the questionnaire was also tested and validated using Cronbach's alpha coefficient. Findings The survey findings indicated that private company laws, national constitution, government policies, lack of sufficient regulations, one-sided regulations and lack of balance, the regulations of other organizations and taxation laws were perceived as the major barriers to the transfer of unfinished public sector construction projects to the private sector in Iran. The ranking of the seven areas produced the following top three ranked barriers areas: taxation laws, government policies and one-sided regulations and lack of balance of importance. Originality/value The elicitation of this study can be useful to both private and public sectors for the development of infrastructure construction projects.
引用
收藏
页码:592 / 607
页数:16
相关论文
共 50 条
  • [1] Barriers to Attracting Private Sector Investment in Public Road Infrastructure Projects in the Developing Country of Iran
    Chan, Daniel W. M.
    Sarvari, Hadi
    Husein, Ahmad Abdul Jaleel Abdul
    Awadh, Khalid Mubarak
    Golestanizadeh, Mahboobeh
    Cristofaro, Matteo
    [J]. SUSTAINABILITY, 2023, 15 (02)
  • [2] Assessing the Barriers and Risks to Private Sector Participation in Infrastructure Construction Projects in Developing Countries of Middle East
    Tamosaitiene, Jolanta
    Sarvari, Hadi
    Chan, Daniel W. M.
    Cristofaro, Matteo
    [J]. SUSTAINABILITY, 2021, 13 (01) : 1 - 20
  • [3] Transferring agricultural biotechnology: US public/private sector perspectives
    Erbisch, FH
    [J]. AGRICULTURAL BIOTECHNOLOGY IN INTERNATIONAL DEVELOPMENT, 1998, (21): : 255 - 272
  • [4] The private sector's role in public sector genetically engineered crop projects
    Potrykus, Ingo
    [J]. NEW BIOTECHNOLOGY, 2010, 27 (05) : 578 - 581
  • [5] TRANSFERRING A NATIONAL INFORMATION-SYSTEM FROM THE PUBLIC-SECTOR TO THE PRIVATE SECTOR - HOW THE ADMINISTRATION ON AGING DID IT
    HALPIN, P
    [J]. JOURNAL OF THE AMERICAN SOCIETY FOR INFORMATION SCIENCE, 1985, 36 (01): : 53 - 55
  • [6] Impact of Public Sector on Sustainability of Public-Private Partnership Projects
    Ma, Hanyang
    Zeng, Saixing
    Lin, Han
    Zeng, Ruochen
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (02)
  • [7] From Public to Private Sector: Motives and explanations for sector switching
    Hansen, Jesper Rosenberg
    [J]. PUBLIC MANAGEMENT REVIEW, 2014, 16 (04) : 590 - 607
  • [8] Remedies for managing bottlenecks and time thieves in Norwegian construction projects - public vs private sector
    Eik-Andresen, Petter
    Landmark, Andreas Dypvik
    Hajikazemi, Sara
    Johansen, Agnar
    Andersen, Bjorn
    [J]. PROCEEDINGS OF THE 29TH IPMA WORLD CONGRESS WC2015, 2016, 226 : 343 - 350
  • [9] TRANSFER OF TECHNOLOGY TO PRIVATE SECTOR FROM PUBLIC-SECTOR OR PUBLIC FINANCING
    PIATIER, A
    [J]. PUBLIC FINANCE AND PERFORMANCE OF ENTERPRISES, 1989, : 119 - 137
  • [10] Barriers to achieving sustainable construction project procurement in the private sector
    Ershadi, Mahmoud
    Jefferies, Marcus
    Davis, Peter
    Mojtahedi, Mohammad
    [J]. CLEANER ENGINEERING AND TECHNOLOGY, 2021, 3