Admission control in deadline-based network resource management

被引:0
|
作者
Liu, YE [1 ]
Wong, JW [1 ]
机构
[1] Univ Manitoba, Dept Comp Sci, Winnipeg, MB R3T 2N2, Canada
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In our deadline-based network resource management framework, each application data unit (ADU) is characterized by a (size, deadline) pair, which can be used to convey the resource and QoS requirements of the ADU. Specifically, the ADU's bandwidth requirement can be implicitly estimated by the ratio: size / (deadline - current time), and the time at which the AD U should be delivered is specified by the deadline. The ADU deadline is mapped onto deadlines at the network layer, which are carried by packets and used by routers for channel scheduling. In an earlier work, we have shown that deadline-based channel scheduling achieves good performance in terms of the percentage of ADUs that are delivered on-time. However, when a network is under heavy load, congestion may occur, and deadline-based scheduling alone may not be sufficient to prevent performance degradation. The level of congestion can be reduced by admission control. In this paper, two application-layer admission control algorithms are developed. The performance of these two algorithms is evaluated by simulation.
引用
下载
收藏
页码:95 / 102
页数:8
相关论文
共 50 条
  • [1] Admission control for multimedia delivery over deadline-based networks
    Liu, Yanni Ellen
    Wu, Jie
    GLOBECOM 2007: 2007 IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE, VOLS 1-11, 2007, : 2058 - 2063
  • [2] Deadline-Based MapReduce Workload Management
    Polo, Jorda
    Becerra, Yolanda
    Carrera, David
    Steinder, Malgorzata
    Whalley, Ian
    Torres, Jordi
    Ayguade, Eduard
    IEEE TRANSACTIONS ON NETWORK AND SERVICE MANAGEMENT, 2013, 10 (02): : 231 - 244
  • [3] Deadline-based Priority Management in Cloud
    Nehru, E. Iniya
    Mukherjee, Saswati
    Kumar, Abhishek
    ARTIFICIAL INTELLIGENCE AND EVOLUTIONARY ALGORITHMS IN ENGINEERING SYSTEMS, VOL 2, 2015, 325 : 745 - 751
  • [4] Deadline based network resource management
    Wong, JW
    Liu, YE
    NINTH INTERNATIONAL CONFERENCE ON COMPUTER COMMUNICATIONS AND NETWORKS, PROCEEDINGS, 2000, : 264 - 268
  • [5] An improved deadline-based message scheduling algorithm for real-time control network
    Yang, Qingyu
    Ju, Lincang
    Ge, Sibo
    Shi, Ren
    COMPUTATIONAL INTELLIGENCE, PT 2, PROCEEDINGS, 2006, 4114 : 1073 - 1078
  • [6] Deadline-based incentive contracts in project management with cost salience
    Chen, Zhihua
    Lan, Yanfei
    Zhao, Ruiqing
    Shang, Changjing
    FUZZY OPTIMIZATION AND DECISION MAKING, 2019, 18 (04) : 451 - 473
  • [7] Deadline-based incentive contracts in project management with cost salience
    Zhihua Chen
    Yanfei Lan
    Ruiqing Zhao
    Changjing Shang
    Fuzzy Optimization and Decision Making, 2019, 18 : 451 - 473
  • [8] Deadline-based workload management for MapReduce environments: Pieces of the perfromance puzzle
    University of Illinois, Urbana-Champaign, IL, United States
    不详
    HP Lab Tech Rep, 2012, 82
  • [9] dSpark: Deadline-based Resource Allocation for Big Data Applications in Apache Spark
    Islam, Muhammed Tawfiqul
    Karunasekera, Shanika
    Buyya, Rajkumar
    2017 IEEE 13TH INTERNATIONAL CONFERENCE ON E-SCIENCE (E-SCIENCE), 2017, : 89 - 98
  • [10] The impact of decision criteria on deadline-based incentive contracts in project management
    Jiao Wang
    Kai Yang
    Ruiqing Zhao
    Journal of Intelligent Manufacturing, 2017, 28 : 643 - 655