BIM - Experiences of the application of a new method in an engineering company

被引:0
|
作者
Mansperger, Tobias [1 ]
Jung, Rolf [1 ]
Thiele, Tobias [1 ]
Steinberg, Andrea [1 ]
机构
[1] Leonhardt Andra & Partner VBI AG, D-10178 Berlin, Germany
关键词
building information modeling; BIM; structural design;
D O I
10.1002/bate.201400019
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Consulting engineers Leonhardt Andra and Partners were able to gather extensive experiences in the application of BIM. Not only first and second level BIM was used in practice, but also by contributing to research projects, the method was developed on higher levels. At daily practice, mainly closed BIMs are worked on by using proprietary software with a specific interface. Already on this first level BIM, many advantages are becoming obvious that also pay off on early project stages. It became apparent, that the application of open BIM with data exchange via IFC limits the functionalities of the participating software, as some model parameters can't be exchanged, or interfaces are defective. The participation in research projects shows on the one hand the chances of open BIM, on the other hand what problems have to be resolved. By developing the interfaces and Cloud/Grid computing, highly complex and computing time consuming analyses are made feasible. Web-based platforms allow efficient co-working of different disciplines and an optimized cooperation of different tools.
引用
收藏
页码:237 / U99
页数:6
相关论文
共 50 条
  • [1] Application Method of BIM Technology in Green Engineering Construction
    Xie, Xaioming
    AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 119 - 121
  • [2] Application method of BIM technology in green engineering construction
    Xie, Xiaoming, 1600, TeknoScienze, Viale Brianza,22, Milano, 20127, Italy (28):
  • [3] BIM - AN APPLICATION IN GEOTECHNICAL ENGINEERING
    Vanicek, Ivan
    Pruska, Jan
    Jirasko, Daniel
    47TH CONFERENCE FOUNDATION ENGINEERING 2019, 2021, 29 : 25 - 29
  • [4] Multiscale BIM Modeling and Adaptive Splicing Method of Mountain Tunnel Structure for Engineering Application
    Li, Xiao-Jun
    Tian, Yin-Xue
    Tang, Li
    Chen, Shu-Wang
    Wang, An-Min
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2019, 32 (02): : 126 - 134
  • [5] An Approach for Improving Method and Model Application in Engineering Design Processes: Case Study of a German Plant Engineering Company
    Hollauer, C.
    Riebl, P.
    Becerril, L.
    Kattner, N.
    Weidmann, D.
    Chucholowski, N.
    Ruhland, K.
    Amann, K.
    Lindemann, U.
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 1240 - 1244
  • [6] GOING METRIC - SOME EXPERIENCES OF AN ENGINEERING COMPANY IN MAKING TRANSITION
    MARKLEW, JJ
    MACHINERY AND PRODUCTION ENGINEERING, 1971, 119 (3065): : 201 - &
  • [7] SMALL ENGINEERING COMPANY ORGANIZATION - A PHILOSOPHY AND METHOD
    JARMIE, TW
    IRE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1956, 3 (01): : 4 - 8
  • [8] Experiences from Norway on implementing BIM in existing bachelor engineering curriculum
    Hjelseth, E.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 3 - 11
  • [9] A Study on the Application of BIM in Civil Engineering Professional Practice
    Zhang, Z. Y.
    Liu, K. M.
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE, EDUCATION MANAGEMENT AND SPORTS EDUCATION, 2015, 39 : 2084 - 2085
  • [10] Situational Method Engineering: Fundamentals and Experiences
    Ralyté, Jolita
    Brinkkemper, Sjaak
    Henderson-Sellers, Brian
    IFIP Advances in Information and Communication Technology, 2007, 244