An ICA based approach for solving profit based unit commitment problem market

被引:36
|
作者
Ghadi, M. Jabbari [1 ]
Baghramian, A. [1 ]
Imani, M. Hosseini [1 ]
机构
[1] Univ Guilan, Fac Engn, Dept Elect Engn, Rasht, Iran
关键词
Deregulated power market; Profit based unit commitment; Imperialist competitive algorithm; LAGRANGIAN-RELAXATION; GENETIC ALGORITHM;
D O I
10.1016/j.asoc.2015.10.026
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
With the advent of paralleling and implementation of restructuring in the power market, some routine rules and patterns of traditional market should be accomplished in a way different from the past. To this end, the unit commitment (UC) scheduling that has once been aimed at minimizing operating costs in an integrated power market, is metamorphosed to profit based unit commitment (PBUC) by adopting a new schema, in which generation companies (GENCOs) have a common tendency to maximize their own profit. In this paper, a novel optimization technique called imperialist competitive algorithm (ICA) as well as an improved version of this evolutionary algorithm are employed for solving the PBUC problem. Moreover, traditional binary approach of coding of initial solutions is replaced with an improved integer based coding method in order to reduce computational complexity and subsequently ameliorate convergence procedure of the proposed method. Then, a sub-ICA algorithm is proposed to obtain optimal generation power of thermal units. Simulation results validate effectiveness and applicability of the proposed method on two scenarios: (a) a set of unimodal and multimodal standard benchmark functions, (b) two GENCOs consist of 10 and 100 generating units. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:487 / 500
页数:14
相关论文
共 50 条
  • [1] A New Approach for Solving Profit-Based Unit Commitment Problem in Competitive Electricity Market
    Sirizi, M. J.
    Ardehali, M. M.
    Nazari, M. E.
    INTERNATIONAL REVIEW OF ELECTRICAL ENGINEERING-IREE, 2010, 5 (03): : 1307 - 1316
  • [2] New approach with Muller method for solving Profit Based Unit Commitment
    Chandram, K.
    Subrahmanyam, N.
    Sydulu, M.
    2008 THIRD INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1-6, 2008, : 952 - 957
  • [3] Multi-agent modeling for solving profit based unit commitment problem
    Sharma, Deepak
    Trivedi, Anupam
    Srinivasan, Dipti
    Thillainathan, Logenthiran
    APPLIED SOFT COMPUTING, 2013, 13 (08) : 3751 - 3761
  • [4] EP BASED PSO METHOD FOR SOLVING PROFIT BASED MULTI AREA UNIT COMMITMENT PROBLEM
    Venkatesan, K.
    Selvakumar, G.
    Rajan, C. C. A.
    JOURNAL OF ENGINEERING SCIENCE AND TECHNOLOGY, 2015, 10 (04): : 442 - 460
  • [5] MOPSO approach to solve Profit Based Unit Commitment problem (PBUCP)
    Dhifaoui, Chefai
    Guesmi, Tawfik
    Hadj Abdallah, Hsan
    2015 4TH INTERNATIONAL CONFERENCE ON SYSTEMS AND CONTROL (ICSC), 2015, : 175 - 182
  • [6] Nodal ant colony optimization for solving profit based unit commitment problem for GENCOs
    Columbus, C. Christopher
    Chandrasekaran, K.
    Simon, Sishaj P.
    APPLIED SOFT COMPUTING, 2012, 12 (01) : 145 - 160
  • [7] Profit based unit commitment problem solution using metaheuristic optimisation approach
    Kumar, V.
    Naresh, R.
    Sharma, Veena
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2023, 10 (01)
  • [8] Hybrid Artificial Immune System Approach for Profit Based Unit Commitment Problem
    Lakshmi, K.
    Vasantharathna, S.
    JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2013, 8 (05) : 959 - 968
  • [9] An MILP Approach for a Profit-Based Unit Commitment Problem with Emissions Penalty
    Che, Ping
    Shi, Gang
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4474 - 4477
  • [10] Profit-based unit commitment solutions in a competitive market
    Calabro, F.
    Casolino, G. M.
    Losi, A.
    Russo, M.
    PROCEEDINGS OF THE 10TH INTERNATIONAL CONFERENCE ON OPTIMIZATION OF ELECTRICAL AND ELECTRONIC EQUIPMENT, VOL I: ELECTROTECHNICS, 2006, : 177 - 182