Application of GPR reverse time migration in tunnel lining cavity imaging

被引:16
|
作者
Lv, Yu-zeng [1 ,2 ]
Wang, Hong-hua [1 ,2 ]
Gong, Jun-bo [1 ]
机构
[1] Guilin Univ Technol, Coll Earth Sci, Guilin 541004, Peoples R China
[2] Guangxi Key Lab Hidden Metall Ore Deposits Explor, Guilin 541004, Peoples R China
基金
中国国家自然科学基金;
关键词
Tunnel lining cavity; ground-penetrating radar (GPR); reverse-time migration (RTM); zero-time imaging condition; GROUND-PENETRATING RADAR; FINITE-ELEMENT;
D O I
10.1007/s11770-020-0815-9
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Correctly locating the tunnel lining cavity is extremely important tunnel quality inspection. High-accuracy imaging results are hard to obtain because conventional one-way wave migration is greatly affected by lateral velocity change and inclination limitation and because the diffracted wave cannot be accurately returned to the real spatial position of the lining cavity. This paper presents a tunnel lining cavity imaging method based on the ground-penetrating radar (GPR) reverse-time migration (RTM) algorithm. The principle of GPR RTM is described in detail using the electromagnetic wave equation. The finite-difference timedomain method is employed to calculate the backward extrapolation electromagnetic fields, and the zero-time imaging condition based on the exploding-reflector concept is used to obtain the RTM results. On this basis, the GPR RTM program is compiled and applied to the simulated and observed GPR data of a typical tunnel lining cavity GPR model and a physical lining cavity model. Comparison of RTM and Kirchhoff migration results reveals that the RTM can better converge the diffracted waves of steel bar and cavity to their true position and have higher resolution and better suppress the effect of multiple interference and clutter scattering waves. In addition, comparison of RTM results of different degrees of noise shows that RTM has strong anti-interference ability and can be used for the accurate interpretation of radar profile in a strong interference environment.
引用
收藏
页码:277 / 284
页数:8
相关论文
共 50 条
  • [1] Application of GPR reverse time migration in tunnel lining cavity imaging
    Yu-zeng Lv
    Hong-hua Wang
    Jun-bo Gong
    Applied Geophysics, 2020, 17 : 277 - 284
  • [2] GPR Detection of Tunnel Lining Cavities and Reverse-time Migration Imaging
    Yu-zeng, Lyu
    Hong-hua, Wang
    Jun-bo, Gong
    APPLIED GEOPHYSICS, 2020,
  • [3] High-precision imaging of small voids in tunnel lining based on reverse time migration
    Ling, Tonghua
    Jiang, Hao
    Zhang, Liang
    Zhang, Sheng
    Bei, Zhenghao
    Long, Bin
    JOURNAL OF GEOPHYSICS AND ENGINEERING, 2024, 21 (04) : 1071 - 1084
  • [4] Reverse-time migration of GPR data for imaging cavities behind a reinforced shield tunnel
    Liu, Hai
    Yue, Yunpeng
    Lian, Yunlong
    Meng, Xu
    Du, Yanliang
    Cui, Jie
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 146
  • [5] Research on forward simulation of tunnel lining cavity GPR images
    Zhang Hong-fei
    Cheng Xiao-jun
    Gao Pan
    Zhou Xin-xin
    ROCK AND SOIL MECHANICS, 2009, 30 (09) : 2810 - 2814
  • [6] Research on forward simulation of tunnel lining cavity GPR images
    Zhang, Hong-Fei
    Cheng, Xiao-Jun
    Gao, Pan
    Zhou, Xin-Xin
    Yantu Lixue/Rock and Soil Mechanics, 2009, 30 (09): : 2810 - 2814
  • [7] Application of gpr in highway tunnel lining quality detection
    Tian, Du
    Xisheng, Deng
    Electronic Journal of Geotechnical Engineering, 2015, 20 (01): : 359 - 367
  • [8] Study on Application of GPR to Quality Detection of Tunnel Lining
    Tang, Shi
    Bai, Xuebing
    MEASUREMENT TECHNOLOGY AND ENGINEERING RESEARCHES IN INDUSTRY, PTS 1-3, 2013, 333-335 : 1611 - +
  • [9] Model and field tests on detection effects of tunnel lining cavity by GPR
    Zhu Z.-R.
    Zhao S.-Q.
    QIN-Xin
    Wu H.-G.
    Zhao C.-Y.
    Wu X.-P.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2022, 44 : 132 - 137
  • [10] Research on application of GPR to quality detection of first lining of tunnel
    Yu Jun
    Liu Song-yu
    Tong Li-yuan
    ROCK AND SOIL MECHANICS, 2008, 29 : 303 - 306