Nitrogen dynamics of a large-scale constructed wetland used to remove excess nitrogen from eutrophic lake water

被引:30
|
作者
Dunne, Ed J. [1 ]
Coveney, Michael F. [1 ]
Marzolf, Erich R. [1 ,2 ]
Hoge, Victoria R. [1 ]
Conrow, Roxanne [1 ]
Naleway, Robert [1 ]
Lowe, Edgar F. [1 ]
Battoe, Lawrence E. [1 ]
Inglett, Patrick W. [3 ]
机构
[1] St Johns River Water Management Dist, Div Water Resources, Palatka, FL 32177 USA
[2] Suwannee River Water Management Dist, Live Oak, FL 32060 USA
[3] Univ Florida, Soil & Water Sci Dept, Gainesville, FL 32611 USA
来源
ECOLOGICAL ENGINEERING | 2013年 / 61卷
关键词
Constructed wetlands; Particulate organic nitrogen; Sedimentation; Ammonium; NONPOINT-SOURCE POLLUTION; SWINE WASTE-WATER; PHOSPHORUS REMOVAL; NUTRIENT REMOVAL; PLANT COMMUNITY; DENITRIFICATION; RETENTION; RESTORATION; HYDROLOGY; QUALITY;
D O I
10.1016/j.ecoleng.2013.09.039
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
Nitrogen loss from landscapes affects downstream freshwater and marine systems. Constructed wetlands, which are ecologically-engineered systems, can mitigate nitrogen loss from various landscape types. We examined the efficacy of a large-scale constructed wetland (the marsh flow-way at Lake Apopka) to remove particulate nitrogen and other nitrogen species from eutrophic lake water. During the first seven years of operation, the hydraulic loading rate to the flow-way was high (mean +/- SD; 34 +/- 10 m yr(-1)). Inflow concentrations of total nitrogen (TN) were also high and variable (mean +/- SD; 4 +/- 1 mg L-1). Both hydraulic loading rate and concentration of N species were affected by variations in lake level. Inflow nitrogen was mostly in particulate forms (particulate organic nitrogen [PON] was 58% of TN). Subsequently, the dominant biogeochemical mechanism for nitrogen removal was sedimentation of PON. Average annual removal rates were 56 g PON m(-2) yr(-1), while TN and total Kjeldahl nitrogen removal rates were similar, about 30 g N m(-2) yr(-1). Nitrogen removal was seasonally dependent, with greatest removal rates occurring during cool periods (October through May). Although the marsh flow-way showed substantial removal of particulate N, the wetland released dissolved inorganic N fractions. Release of ammonium (NH4) averaged 21 g N m(-2) yr(-1). Release of NH4 was greatest during warm periods (June through September), which was probably related to increased water temperature, associated increased decomposition, and decreased dissolved oxygen content of wetland waters. Long-term first order rate constants (k) for removal were also high. Annual k values for PON were 85 m yr(-1). Managing the marsh flow-way to maximize particulate N removal in the long-term, while mitigating the release of inorganic N during warm periods, will require dynamic wetland management. Published by Elsevier B.V.
引用
收藏
页码:224 / 234
页数:11
相关论文
共 50 条
  • [1] Phosphorus removal performance of a large-scale constructed treatment wetland receiving eutrophic lake water
    Dunne, Ed J.
    Coveney, Michael F.
    Hoge, Victoria R.
    Conrow, Roxanne
    Naleway, Robert
    Lowe, Edgar F.
    Battoe, Lawrence E.
    Wang, Yaping
    [J]. ECOLOGICAL ENGINEERING, 2015, 79 : 132 - 142
  • [2] Efficacy of a large-scale constructed wetland to remove phosphorus and suspended solids from Lake Apopka, Florida
    Dunne, Ed J.
    Coveney, Michael F.
    Marzolf, Erich R.
    Hoge, Victoria R.
    Conrow, Roxanne
    Naleway, Robert
    Lowe, Edgar F.
    Battoe, Lawrence E.
    [J]. ECOLOGICAL ENGINEERING, 2012, 42 : 90 - 100
  • [3] Nitrogen dynamics in large shallow eutrophic Lake Chaohu, China
    Zhang, M.
    Xu, J.
    Xie, P.
    [J]. ENVIRONMENTAL GEOLOGY, 2008, 55 (01): : 1 - 8
  • [4] Enhanced Nitrogen Removal of Eutrophic Water in Constructed Wetland by Novel Integration of Submerged Macrophyte Pond
    Ding, Yi
    Lin, Guangwei
    Liu, Xingpo
    Song, Xinshan
    [J]. POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2022, 31 (03): : 2485 - 2491
  • [5] Efficacy of a large-scale constructed wetland to remove phosphorus and suspended solids from Lake Apopka, Florida (vol 42, pg 90, 2012)
    Dunne, Ed J.
    Coveney, Michael F.
    Marzolf, Erich R.
    Hoge, Victoria R.
    Conrow, Roxanne
    Naleway, Robert
    Lowe, Edgar F.
    Battoe, Lawrence E.
    [J]. ECOLOGICAL ENGINEERING, 2013, 52 : 316 - 316
  • [6] A study on the ability to remove nitrogen and phosphorus from eutrophic water by aquatic macrophyte
    School of Resource and Environment Engineering, Wuhan University of Technology, Wuhan
    430070, China
    不详
    453000, China
    [J]. Conf. Proc. Int. Symp. Proj. Manag., ISPM, (51-56):
  • [7] NITROGEN REMOVAL FROM RECLAIMED WATER APPLIED TO CONSTRUCTED AND NATURAL WETLAND MICROCOSMS
    GALE, PM
    REDDY, KR
    GRAETZ, DA
    [J]. WATER ENVIRONMENT RESEARCH, 1993, 65 (02) : 162 - 168
  • [8] Effect of water level fluctuation on nitrogen removal from constructed wetland mesocosms
    Tanner, CC
    D'Eugenio, J
    McBride, GB
    Sukias, JPS
    Thompson, K
    [J]. ECOLOGICAL ENGINEERING, 1999, 12 (1-2) : 67 - 92
  • [9] REMOVAL EFFICIENCY OF A FIELD-SCALE CONSTRUCTED WETLAND IN TREATING EUTROPHIC WATER: A CASE STUDY OF XINYUN LAKE, CHINA
    Wu, Haodong
    Huang, Ping
    [J]. FRESENIUS ENVIRONMENTAL BULLETIN, 2011, 20 (09): : 2251 - 2257
  • [10] Nitrogen removal from Lake Caohai, a typical ultra-eutrophic lake in China with large scale confined growth of Eichhornia crassipes
    Wang, Zhi
    Zhang, Zhiyong
    Zhang, Yingying
    Zhang, Jungian
    Yan, Shaohua
    Guo, Junyao
    [J]. CHEMOSPHERE, 2013, 92 (02) : 177 - 183