Internet-based manufacturing scheduling: Architecture and implementation

被引:0
|
作者
Tu, Y [1 ]
Luh, PB [1 ]
Ni, M [1 ]
Thakur, LS [1 ]
机构
[1] Univ Connecticut, Dept Elect & Comp Engn, Storrs, CT 06269 USA
关键词
manufacturing scheduling; Internet-based applications; job shop scheduling; Lagrangian relaxation;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In view of today's "time-based competition," scheduling manufacturing operations using the most advanced scheduling tools has become a crucial issue for manufacturers. This can be achieved by using an Internet-based scheduling system. The main considerations in designing such a system are how to provide an effective scheduling tool without major investment, and how to ensure fast and easy access for manufacturers who have diversified computational platforms and settings. This paper presents such an Internet-based scheduling system that meets these considerations. The system is a novel combination of judiciously selected components with several architectural design options, and delivers high quality scheduling solutions in a reasonable computational time via a user friendly and secure Internet environment. The testing results are compared for different implementations of scheduling systems and results for problems of different sizes are provided.
引用
收藏
页码:1107 / 1112
页数:6
相关论文
共 50 条
  • [1] Implementation of internet-based personal robot with internet control architecture
    Han, KH
    Kim, S
    Kim, YJ
    Lee, SE
    Kim, JH
    [J]. 2001 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS I-IV, PROCEEDINGS, 2001, : 217 - 222
  • [2] Internet-based design and manufacturing on an Open Architecture Machining center
    Wang, FC
    Wright, PK
    [J]. 1998 JAPAN-U.S.A. SYMPOSIUM ON FLEXIBLE AUTOMATION - PROCEEDINGS, VOLS I AND II, 1998, : 221 - 228
  • [3] Research on initiative scheduling mode for a physical internet-based manufacturing system
    Jun-qiang Wang
    Guo-qiang Fan
    Fei-yi Yan
    Ying-feng Zhang
    Shu-dong Sun
    [J]. The International Journal of Advanced Manufacturing Technology, 2016, 84 : 47 - 58
  • [4] Research on initiative scheduling mode for a physical internet-based manufacturing system
    Wang, Jun-qiang
    Fan, Guo-qiang
    Yan, Fei-yi
    Zhang, Ying-feng
    Sun, Shu-dong
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 84 (1-4): : 47 - 58
  • [5] Internet-based collaborative manufacturing
    Ranky, PG
    [J]. ASSEMBLY AUTOMATION, 2001, 21 (02) : 99 - 100
  • [6] Design and Implementation of an Internet-Based Household Activity Scheduling Survey in Cairo, Egypt
    Mosa, Ahmed Ibrahem
    El Esawey, Mohamed
    [J]. JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2014, 140 (04)
  • [7] B/S implementation of internet-based electrical engineering lab with MVC architecture
    Zhang, Huan
    Zhu, Shanan
    [J]. 2013 10TH IEEE INTERNATIONAL CONFERENCE ON CONTROL AND AUTOMATION (ICCA), 2013, : 551 - 555
  • [8] Internet Control Architecture for Internet-Based Personal Robot
    Kuk-Hyun Han
    Sinn Kim
    Yong-Jae Kim
    Jong-Hwan Kim
    [J]. Autonomous Robots, 2001, 10 : 135 - 147
  • [9] Internet control architecture for internet-based personal robot
    Han, KH
    Kim, S
    Kim, YJ
    Kim, JH
    [J]. AUTONOMOUS ROBOTS, 2001, 10 (02) : 135 - 147
  • [10] An Internet-based Telerobot Design and Implementation
    赵明国
    [J]. High Technology Letters, 2001, (02) : 76 - 79