共 50 条
- [1] Stabilization of a large rock wedge in the underground powerhouse of the Pergau Hydroelectric Project, Malaysia. GROUND ANCHORAGES AND ANCHORED STRUCTURES, 1997, : 158 - 171
- [2] Parametric Modeling of Underground Powerhouse for Finite Element Analysis PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3222 - +
- [3] Monitoring and analysis of chamber excavation of Yutan underground powerhouse Ren Min Chang Jiang, 4 (31-33):
- [4] Analysis on causes of deformation and failure of large scale underground powerhouse FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 644 - +
- [5] Stability Analysis of Surrounding Rock Mass of Underground Powerhouse Cavern CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 878 - +
- [7] Modeling and back analysis for a large scale underground powerhouse complex HYDROPOWER '97, 1997, : 653 - 658
- [8] EXCAVATION OF WORLDS LARGEST UNDERGROUND POWERHOUSE JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1978, 104 (03): : 333 - 351
- [10] Stability analysis of determined blocks in the underground powerhouse of guandi hydropower station ADVANCES IN DISCONTINUOUS NUMERICAL METHODS AND APPLICATIONS IN GEOMECHANICS AND GEOENGINEERING, 2012, : 219 - 225