Bi-objective Fuzzy Mathematical Models in a Labor-Intensive Cell

被引:4
|
作者
Sadeghi, Azadeh [1 ]
Sinaki, Roohollah Younes [1 ]
Suer, Gursel A. [1 ]
机构
[1] Ohio Univ, Dept Ind & Syst Engn, Athens, OH 45701 USA
关键词
Cellular manufacturing; Labor intensive cell; Fuzzy bi-objective mathematical model; LOADING PROBLEM;
D O I
10.1016/j.promfg.2018.10.040
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, a bi-objective fuzzy model for a single product multi-period scheduling problem is discussed. The objectives of the fuzzy model are maximizing the customer satisfaction while minimizing the manpower level in a labor-intensive environment. Two options are considered for the proposed mathematical model. In the first one, the manpower level is allowed to vary from one period to the next. Therefore, the model selects the best manpower level for each period based on the customer demand in that period. In the second option, the manpower level is kept the same in each period. In this situation, the critical decision is to determine the optimal manpower configuration to avoid resources' idle time and shortage simultaneously. For simplification, time-varying but deterministic demand values are considered. Similarly, processing times are also assumed to be deterministic. The fuzzy function used in our approach is the minimum bounded sum which is achieved by setting bound limits for each of the fuzzy parameters. In the experiment and results section, a small problem taken from a case study is solved considering both options and multiple bound limits. (C) 2018 The Authors. Published by Elsevier B.V.
引用
收藏
页码:222 / 229
页数:8
相关论文
共 50 条
  • [1] Effects of different fuzzy operators on fuzzy bi-objective cell loading problem in labor-intensive manufacturing cells
    Suer, G. A.
    Arikan, F.
    Babayigit, C.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (02) : 476 - 488
  • [2] A bi-objective mathematical model toward dynamic cell formation considering labor utilization
    Rafiei, H.
    Ghodsi, R.
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (04) : 2308 - 2316
  • [3] Models for cell loading and product sequencing in labor-intensive cells
    Suer, Gursel A.
    Cosner, Jeremy
    Patten, Amanda
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (01) : 97 - 105
  • [4] Multi-objective scheduling in labor-intensive manufacturing systems
    Stier, Guirsel
    Almasarwah, Najat
    Alhawari, Omar
    Davis, Casey
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2020, 57 : 469 - 483
  • [5] Research on the Personnel Scheduling Mathematical Model in Labor-intensive Production Units
    Wang, Yiqi
    Zhang, Xiaodong
    Zhao, Dongfang
    Zhang, Enwu
    [J]. INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND INDUSTRIAL AUTOMATION (ICITIA 2015), 2015, : 441 - 447
  • [6] EFFICIENCY AND SOLUTION APPROACHES TO BI-OBJECTIVE MATHEMATICAL PROGRAMS
    WENDELL, RE
    [J]. LECTURE NOTES IN ECONOMICS AND MATHEMATICAL SYSTEMS, 1983, 209 : 389 - 399
  • [7] A fuzzy bi-objective mathematical model for optimum portfolio selection by considering inflation rate effects
    Sadoullah Ebrahimnejad
    Mohammad Hossein Hosseinpour
    Ali Mohammadi Nasrabadi
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 69 : 595 - 616
  • [8] BI-OBJECTIVE OPTIMIZATION MODELS FOR NETWORK INTERDICTION
    Chen, Yan
    Guo, Cheng
    Yu, Shenghan
    [J]. RAIRO-OPERATIONS RESEARCH, 2019, 53 (02) : 461 - 472
  • [9] A fuzzy bi-objective mathematical model for optimum portfolio selection by considering inflation rate effects
    Ebrahimnejad, Sadoullah
    Hosseinpour, Mohammad Hossein
    Nasrabadi, Ali Mohammadi
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (1-4): : 595 - 616
  • [10] Bi-objective fuzzy selective maintenance allocation problem
    Quddoos, Abdul
    Ali, Irfan
    Khalid, M. Masood
    [J]. American Journal of Mathematical and Management Sciences, 2015, 34 (04) : 289 - 308