A-Team for Solving the Resource Availability Cost Problem

被引:0
|
作者
Jedrzejowicz, Piotr [1 ]
Ratajczak-Ropel, Ewa [1 ]
机构
[1] Gdynia Maritime Univ, Dept Informat Syst, PL-81225 Gdynia, Poland
关键词
project scheduling; resource availability cost problem; RACP; resource investment problem; RIP; optimization; A-Team; agent; agent system; CLASSIFICATION; SUBJECT;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper the agent system based on A-Team and E-JABAT architecture for solving the resource availability cost problem (RACP) is proposed and experimentally tested. RACP known also as RIP (resource investment problem) belongs to the NP-hard problem class. To solve this problem an A-Team consisting of an asynchronous agents implemented using E-JABAT middleware have been proposed. Three kinds of optimization agent have been used. Computational experiment involves evaluation of the proposed approach.
引用
收藏
页码:443 / 452
页数:10
相关论文
共 50 条
  • [1] A-Team for Solving MRCPSP/max Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    [J]. AGENT AND MULTI-AGENT SYSTEMS: TECHNOLOGIES AND APPLICATIONS, 2011, 6682 : 466 - 475
  • [2] Reinforcement Learning strategies for A-Team solving the Resource-Constrained Project Scheduling Problem
    Jedrzejowicz, P.
    Ratajczak-Ropel, E.
    [J]. NEUROCOMPUTING, 2014, 146 : 301 - 307
  • [3] A-Team Solving Distributed Resource-Constrained Multi-Project Scheduling Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    [J]. VIETNAM JOURNAL OF COMPUTER SCIENCE, 2019, 6 (04) : 423 - 437
  • [4] A-Team Solving Distributed Resource-Constrained Multi-project Scheduling Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2018, PT II, 2018, 11056 : 243 - 253
  • [5] Reinforcement Learning Strategy for A-Team Solving the Resource-Constrained Project Scheduling Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, 2013, 8083 : 457 - 466
  • [6] Experimental Evaluation of the A-Team Solving Instances of the RCPSP/max Problem
    Ratajczak-Ropel, Ewa
    [J]. AGENT AND MULTI-AGENT SYSTEMS: TECHNOLOGIES AND APPLICATIONS, PT II, PROCEEDINGS, 2010, 6071 : 210 - 219
  • [7] Evaluation of Agents Performance within the A-Team Solving RCPSP/Max Problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT I, 2010, 6421 : 393 - 402
  • [8] Solving resource availability cost problem in project scheduling by pseudo particle swarm optimization
    Qi, Jianjun
    Guo, Bo
    Lei, Hongtao
    Zhang, Tao
    [J]. JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2014, 25 (01) : 69 - 76
  • [9] Solving resource availability cost problem in project scheduling by pseudo particle swarm optimization
    Jianjun Qi
    Bo Guo
    Hongtao Lei
    Tao Zhang
    [J]. Journal of Systems Engineering and Electronics, 2014, 25 (01) : 69 - 76
  • [10] Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
    Ranjbar, Mohammad
    Kianfar, Fereydoon
    Shadrokh, Shahram
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2008, 196 (02) : 879 - 888