Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems

被引:38
|
作者
Tung, LF [1 ]
Lin, L [1 ]
Nagi, R [1 ]
机构
[1] SUNY Buffalo, Dept Ind Engn, Buffalo, NY 14260 USA
关键词
flexible manufacturing systems; hierarchical scheduling; multiple objectives;
D O I
10.1023/A:1008183330452
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a hierarchical approach to scheduling flexible manufacturing systems (FMSs) that pursues multiple performance objectives and considers the process flexibility of incorporating alternative process plans and resources for the required operations. The scheduling problem is solved at two levels: the shop level and the manufacturing system level. The shop level controller employs a combined priority index developed in this research to rank shop production orders in meeting multiple scheduling objectives. To overcome dimensional complexity and keep a low level of work-in-process inventory, the shop controller first selects up to three production orders with the highest ranking as candidates and generates all possible release sequences for them, with or without multitasking. These sequences are conveyed to the manufacturing system controller, who then performs detailed scheduling of the machines in the FMS using a fixed priority heuristic for routing parts of multiple types while considering alternative process plans and resources for the operations. The FMS controller provides feedback to the shop controller with a set of suggested detailed schedules and projected order completion times. On receiving these results, the shop controller further evaluates each candidate schedule using a multiple-objective function and selects the best schedule for execution. This allows multiple performance objectives of an FMS to be achieved by the integrated hierarchical scheduling approach.
引用
收藏
页码:379 / 409
页数:31
相关论文
共 50 条
  • [1] Multiple-Objective Scheduling for the Hierarchical Control of Flexible Manufacturing Systems
    Ling-Feng Tung
    Li Lin
    Rakesh Nagi
    [J]. International Journal of Flexible Manufacturing Systems, 1999, 11 : 379 - 409
  • [2] A DYNAMIC SCHEDULING FOR FLEXIBLE MANUFACTURING SYSTEMS - HIERARCHICAL CONTROL AND DISPATCHING BY HEURISTICS
    YOSHIDA, T
    NAKASUKA, S
    [J]. PROCEEDINGS OF THE 28TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-3, 1989, : 846 - 852
  • [3] Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
    Lee, Y. F.
    Jiang, Z. B.
    Liu, H. R.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (03) : 866 - 884
  • [4] Multiple objective scheduling for flexible manufacturing systems using Petri nets and heuristic search
    Yim, SJ
    Lee, DY
    [J]. INFORMATION INTELLIGENCE AND SYSTEMS, VOLS 1-4, 1996, : 2984 - 2989
  • [5] A HIERARCHICAL MODEL FOR CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS
    SODHI, MS
    ASKIN, RG
    SEN, S
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (10) : 1185 - 1196
  • [6] MULTIPLE-OBJECTIVE SCHEDULING FOR BATCH PROCESS SYSTEMS USING STOCHASTIC UTILITY EVALUATION
    Park, Hongsuk
    Shin, Youngchul
    Moon, Ilkyeong
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2024, 31 (02): : 413 - 428
  • [7] MULTIPLE-OBJECTIVE SYSTEMS - WHATS THE PROBLEM
    FRECKLETON, S
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1986, 37 (12) : 1152 - 1153
  • [8] Hybrid genetic algorithmsfor a multiple-objective scheduling problem
    Sergio Cavalieri
    Paolo Gaiardelli
    [J]. Journal of Intelligent Manufacturing, 1998, 9 : 361 - 367
  • [9] Multiple-objective heuristics for scheduling unrelated parallel machines
    Lin, Yang-Kuei
    Fowler, John W.
    Pfund, Michele E.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 227 (02) : 239 - 253
  • [10] Hybrid genetic algorithms for a multiple-objective scheduling problem
    Dipartimento di Economia, Politecnico di Milano, Piazza Leonardo da Vinci, 32 I-20133, Milano, Italy
    不详
    [J]. J Intell Manuf, 4 (361-367):