共 50 条
- [1] Long-term pilot testing of the carbonate looping process in 1 MWth scale [J]. FUEL, 2017, 210 : 892 - 899
- [2] Performance of the carbonator and calciner during long-term carbonate looping tests in a 1 MWth pilot plant [J]. JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING, 2020, 8 (01):
- [3] Long-term carbonate looping testing in a 1 MWth pilot plant with hard coal and lignite [J]. 13TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-13, 2017, 114 : 179 - 190
- [9] USE OF PILOT-PLANT FERMENTERS FOR SCALE-UP [J]. BIOTECHNOLOGY AND BIOENGINEERING, 1973, (04) : 861 - 861
- [10] Design of a 20 MWth carbonate looping pilot plant for CO2-capture of coal fired power plants by means of limestone [J]. 12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 : 2178 - 2189