Power interruption costs to industries in Cameroon

被引:29
|
作者
Diboma, B. S. [1 ,2 ]
Tatietse, T. Tamo [2 ]
机构
[1] Univ Douala, ENSET, Douala, Cameroon
[2] Univ Yaounde I, Ecole Natl Super Polytech Yaounde, Yaounde, Cameroon
关键词
Electricity; Interruptions; Costs; RELIABILITY; SECTOR;
D O I
10.1016/j.enpol.2013.07.014
中图分类号
F [经济];
学科分类号
02 ;
摘要
This study focusses on the estimation of power interruption costs to industries in Cameroon. Those interruptions are the result of perturbations sustained by the power network. A normalised direct worth (NDW) approach was used as a direct method for assessment, while the compensatory estimation method (CEM) was used for indirect assessment. A survey was conducted with a representative sample of industries in Cameroon using a questionnaire as the main research instrument. The results show that power interruption losses are very significant. Using the direct method for assessment, the average outage cost varies from (sic)3.62/kWh to (sic)5.42/kWh for a 1-h interruption and from 1.96/kWh to (sic)2.46/kWh for a 4-h outage. The study finds that advance suspension notices could help in reducing outage costs by 19.83-33%. With the indirect method, the total capital costs and total running costs of generators are approximately (sic)180,040,180.08 and (sic)4,305,510.6, respectively, while the average cost per unused kWh of electricity stands at (sic)3.37/kWh. The study concludes that power interruptions have a significant negative effect on industries in Cameroon. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:582 / 592
页数:11
相关论文
共 50 条
  • [1] Influence Power Losses Costs to Optimization Focused to Minimization Interruption Costs
    Paar, Martin
    Topolanek, David
    [J]. PROCEEDINGS OF THE 12TH INTERNATIONAL SCIENTIFIC CONFERENCE ELECTRIC POWER ENGINEERING 2011, 2011, : 580 - 583
  • [2] Power interruption costs to industrial and commercial consumers of electricity
    Sullivan, MJ
    Vardell, T
    Johnson, M
    [J]. IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1997, 33 (06) : 1448 - 1458
  • [3] ESTIMATION OF POWER SUPPLY INTERRUPTION COSTS FOR LATVIAN CUSTOMERS
    Lvovs, A.
    Mutule, A.
    [J]. LATVIAN JOURNAL OF PHYSICS AND TECHNICAL SCIENCES, 2013, 50 (03) : 24 - 34
  • [4] Power interruption costs to industrial and commercial consumers of electricity
    Sullivan, MJ
    Vardell, T
    Johnson, M
    [J]. 1996 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS TECHNICAL CONFERENCE, CONFERENCE RECORD, 1996, : 23 - 35
  • [5] Assessment of power interruption costs for the industrial customers in Greece
    Koskolos, NC
    Megaloconomos, SM
    Dialynas, EN
    [J]. 8TH INTERNATIONAL CONFERENCE ON HARMONICS AND QUALITY OF POWER, PROCEEDINGS, VOLS 1 AND 2, 1998, : 761 - 766
  • [6] Power Interruption Costs to Commercial Customers of Electricity in Korea
    Kim, Dong-Sub
    Kim, Kil-Sin
    [J]. JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2014, 9 (05) : 1495 - 1500
  • [7] On the Evaluation of Customers Interruption Costs due to Unexpected Power Outages
    Lehtonen, Matti
    Gunduz, Niyazi
    Kufeoglu, Sinan
    [J]. 2018 IEEE 59TH INTERNATIONAL SCIENTIFIC CONFERENCE ON POWER AND ELECTRICAL ENGINEERING OF RIGA TECHNICAL UNIVERSITY (RTUCON), 2018,
  • [8] Assessing the business interruption costs from power outages in China
    Chen, Hao
    Yan, Haobo
    Gong, Kai
    Geng, Haopeng
    Yuan, Xiao-Chen
    [J]. ENERGY ECONOMICS, 2022, 105
  • [9] Assessment of electricity supply interruption costs in Estonian power system
    Raesaar, P
    Tiigimägi, E
    Valtin, J
    [J]. OIL SHALE, 2005, 22 (02) : 217 - 231
  • [10] Assessment of electricity supply interruption costs in Estonian power system
    Department of Electrical Power Engineering, Tallinn University of Technology, 5 Ehitajate Rd., Tallinn 19086, Estonia
    [J]. Oil Shale, 2006, 2 (217-231)