Iterative multimodal processes scheduling

被引:26
|
作者
Bocewicz, Grzegorz [1 ]
Nielsen, Izabela [2 ]
Banaszak, Zbigniew [3 ]
机构
[1] Koszalin Univ Technol, Dept Comp Sci & Management, PL-75453 Koszalin, Poland
[2] Aalborg Univ, Dept Mech & Mfg Engn, Aalborg, Denmark
[3] Warsaw Univ Technol, Dept Business Informat, PL-02524 Warsaw, Poland
关键词
FORMAL APPROACH;
D O I
10.1016/j.arcontrol.2014.03.011
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The paper considers the problem of Automated Guided Vehicles (AGVs) fleet scheduling subject to the right match-up of local cyclic acting AGV schedules to given workpiece machining schedules. The main contribution of this work is the solution to a constraint satisfaction problem aimed at AGVs fleet match-up scheduling while taking into consideration assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS's material handling and production routes of simultaneously manufactured work orders as well as cyclic schedules of concurrently manufactured product types, the goal is to provide a declarative model enabling multimodal processes, i.e. employing AGVs, hoists, lifts, etc. demand-responsible scheduling of transportation/handling services. An algebra-like driven approach to cyclic scheduling based on step-by-step composition of multimodal transportation network sub-structures is proposed. Results of computational experiments assessing scalability of the method provided are presented as well. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:113 / 122
页数:10
相关论文
共 50 条
  • [1] Toward Cyclic Scheduling of Concurrent Multimodal Processes
    Bocewicz, Grzegorz
    Wojcik, Robert
    Banaszak, Zbigniew A.
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT I, 2011, 6922 : 448 - 457
  • [2] Multimodal processes scheduling in mesh-like network environment
    Bocewicz, Grzegorz
    Banaszak, Zbigniew
    [J]. ARCHIVES OF CONTROL SCIENCES, 2015, 25 (02): : 237 - 261
  • [3] Integration of Scheduling & Control for Sequential Batch Processes: An Iterative Approach
    Misra, Shamik
    Gudi, Ravindra D.
    [J]. IFAC PAPERSONLINE, 2018, 51 (01): : 84 - 89
  • [4] Cyclic scheduling of multimodal processes in crystalline-like network structures
    Bocewicz, Grzegorz
    Wojcik, Robert
    Banaszak, Zbigniew
    [J]. KNOWLEDGE-BASED AND INTELLIGENT INFORMATION & ENGINEERING SYSTEMS 18TH ANNUAL CONFERENCE, KES-2014, 2014, 35 : 1567 - 1576
  • [5] Iterative module scheduling
    Rau, BR
    [J]. INTERNATIONAL JOURNAL OF PARALLEL PROGRAMMING, 1996, 24 (01) : 3 - 64
  • [6] Iterative scheduling algorithms
    Bayati, Mohsen
    Prabhakar, Balaji
    Shah, Devavrat
    Sharma, Mayank
    [J]. INFOCOM 2007, VOLS 1-5, 2007, : 445 - +
  • [7] ITERATIVE PROCESSES
    MIELKE, MV
    [J]. NOTICES OF THE AMERICAN MATHEMATICAL SOCIETY, 1975, 22 (05): : A549 - A549
  • [8] Scheduling multimodal transportation systems
    Castelli, L
    Pesenti, R
    Ukovich, W
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 155 (03) : 603 - 615
  • [9] Seamless Multimodal Transportation Scheduling
    Raghunathan, Arvind U.
    Bergman, David
    Hooker, John N.
    Serra, Thiago
    Kobori, Shingo
    [J]. INFORMS JOURNAL ON COMPUTING, 2024, 36 (02) : 336 - 358
  • [10] SCHEDULING AND RESCHEDULING WITH ITERATIVE REPAIR
    ZWEBEN, M
    DAVIS, E
    DAUN, B
    DEALE, MJ
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1993, 23 (06): : 1588 - 1596