Measuring Network Reliability by Considering Paradoxes Multiple Network Demon Approach

被引:13
|
作者
Szeto, W. Y. [1 ]
O'Brien, Liam [2 ]
O'Mahony, Margaret [2 ]
机构
[1] Natl Univ Singapore, Dept Civil Engn, Singapore 117576, Singapore
[2] Trinity Coll Dublin, Dept Civil Struct & Environm Engn, Ctr Transport Res, Dublin 2, Ireland
关键词
TRAFFIC ASSIGNMENT; BRAESS PARADOX; FORMULATION;
D O I
10.3141/2090-05
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Traditionally, game theoretic approaches to measuring transport network reliability have relied on the outcome of a game played between network users seeking to minimize their travel costs and an origin-destination-specific (O-D-specific) demon that seeks the opposite by damaging links in the network. This problem assumes the presence of only one demon in each O-D pair and assumes the capacity reduction to be 50% if the link is selected for damage by one or more O-D-specific demons. The game is typically expressed as a path-based formulation, which is computationally intensive since the formulation requires path enumeration. With relaxation of the assumptions on the O-D-specific nature of the demons and the capacity reduction, a link-based multiple network demon formulation is proposed by the nonlinear complementarity problem approach, in which each demon is free to select any link to damage. Within this framework, the effects of the proposed model on total expected network cost and reliability measures are examined, and specific examples demonstrate the paradoxical phenomenon that if one adds a road to a network, then all travelers may be worse off for total expected network cost or travel time reliability. Overall, the results indicate the importance of assumptions used to total expected network cost and reliability measures and provide some insights into the problem of ignoring these paradoxical phenomena in reliable and robust network design.
引用
收藏
页码:42 / 50
页数:9
相关论文
共 50 条
  • [1] Cooperative game approaches to measuring network reliability considering paradoxes
    Szeto, W. Y.
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2011, 19 (02) : 229 - 241
  • [2] COOPERATIVE GAME APPROACHES TO MEASURING NETWORK RELIABILITY CONSIDERING PARADOXES
    Szeto, W. Y.
    [J]. 18TH INTERNATIONAL SYMPOSIUM ON TRANSPORTATION AND TRAFFIC THEORY, 2009, : 259 - 279
  • [3] Measuring network reliability: A game theoretic approach
    Bell, MGH
    [J]. JOURNAL OF ADVANCED TRANSPORTATION, 1999, 33 (02) : 135 - 146
  • [4] An Approach forDistribution Network Expansion Planning Considering Reliability Issues
    Bagheri, A.
    Monsef, H.
    Lesani, H.
    [J]. 2015 30TH INTERNATIONAL POWER SYSTEM CONFERENCE (PSC), 2015, : 309 - 317
  • [5] Reliability Assessment of Distribution Network Considering Multiple Types of Information Disturbances
    Chen, Biyun
    Lu, Zhi
    Li, Bin
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (19): : 103 - 110
  • [6] Optimal Network Configuration Considering Network Losses and Service Reliability
    Gharebaghi, Sina
    Izadi, Milad
    Safdarian, Amir
    [J]. 2017 SMART GRID CONFERENCE (SGC), 2017,
  • [7] Two-Stage Stochastic Approach for Reference Network Considering Uncertain Reliability
    Xu, Hao
    Wang, Mingqiang
    Li, Xiao
    [J]. 10TH ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC 2018), 2018, : 299 - 305
  • [8] Road Network Capacity Reliability Considering Travel Time Reliability
    Kuang, Aiwu
    Tang, Zhiqiang
    Shan, Liangci
    [J]. INTELLIGENT AND INTEGRATED SUSTAINABLE MULTIMODAL TRANSPORTATION SYSTEMS PROCEEDINGS FROM THE 13TH COTA INTERNATIONAL CONFERENCE OF TRANSPORTATION PROFESSIONALS (CICTP2013), 2013, 96 : 1818 - 1827
  • [9] EFFECTIVE METHOD OF MEASURING THE RELIABILITY OF THE GAS NETWORK
    Feng, Chen
    Wu Changchun
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2016, VOL 7, 2017,
  • [10] Considering retransmission mechanism and latency for network reliability evaluation in a stochastic computer network
    Lin, Yi-Kuei
    Pan, Chih-Li
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2014, 31 (06) : 350 - 358