Volumetric analysis of rock mass instability around haulage drifts in underground mines

被引:11
|
作者
Shnorhokian, Shahe [1 ]
MacNeil, Bryce [1 ]
Mitri, Hani S. [1 ]
机构
[1] McGill Univ, Dept Min & Mat Engn, Montreal, PQ H3A 0E8, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Haulage drifts; Rock mass instability; Volumetric analysis; Stope sequences; Numerical modeling; STRESS PATH; STABILITY; PROPAGATION; INITIATION; SEQUENCE; FRACTURE; FAILURE; DAMAGE; MODEL;
D O I
10.1016/j.jrmge.2017.09.003
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Haulage networks are vital to underground mining operations as they constitute the arteries through which blasted ore is transported to surface. In the sublevel stoping method and its variations, haulage drifts are excavated in advance near the ore block that will be mined out. Numerical modeling is a technique that is frequently employed to assess the redistribution of mining-induced stresses, and to compare the impact of different stope sequence scenarios on haulage network stability. In this study, typical geological settings in the Canadian Shield were replicated in a numerical model with a steeply-dipping tabular orebody striking EW. All other formations trended in the same direction except for two dykes on either side of the orebody with a WNW-ESE strike. Rock mass properties and in situ stress measurements from a case study mine were used to calibrate the model. Drifts and crosscuts were excavated in the footwall and two stope sequence scenarios - a diminishing pillar and a center-out one - were implemented in 24 mining stages. A combined volumetric-numerical analysis was conducted for two active levels by comparing the extent of unstable rock mass at each stage using shear, compressive, and tensile instability criteria. Comparisons were made between the orebody and the host rock, between the footwall and hanging wall, and between the two stope sequence scenarios. It was determined that in general, the center-out option provided a larger volume of instability with the shear criterion when compared to the diminishing pillar one (625,477 m(3) compared to 586,774 m(3) in the orebody; 588 m(3) compared to 403 m(3) in the host rock). However, the reverse was true for tensile (134,298 m(3) compared to 128,834 m(3) in the orebody; 91,347 m(3) compared to 67,655 m(3) in the host rock) instability where the diminishing pillar option had the more voluminous share. (C) 2017 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V.
引用
收藏
页码:60 / 71
页数:12
相关论文
共 50 条