A Hybrid Quantum Estimation of Distribution Algorithm (Q-EDA) for Flow-Shop Scheduling

被引:0
|
作者
Latif, Muhammad Shahid [1 ]
Zhou, Hong [1 ]
Amir, Muhammad [2 ]
机构
[1] Beihang Univ, Sch Econ & Management, Beijing 100191, Peoples R China
[2] Beihang Univ, Sch Comp Sci & Engn, Beijing 100191, Peoples R China
关键词
quantum genetic algoritm; estimation of distribution algorithm; flow shop sccheduling; INSPIRED GENETIC ALGORITHM; REACTIVE POWER;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Intrinsically, the Permutation Flow-Shop Scheduling Problem (PFSSP) is a typical combinatorial optimization problem. It encompasses a strong scientific and engineering background and remains a NP-hard problem over decades. Scheduling and sequencing have played a vital role and had massive applications in modern industries and manufacturing systems. Therefore in order to improve and enhance the performance and efficiency of industrial manufacturing systems in present competitive era, it is worthwhile to develop effective scheduling techniques and approaches. In this paper, a hybrid approach is proposed which is based on standard Quantum Genetic Algorithm (QGA) and Estimation of Distribution Algorithm (EDA), aiming at permutation flow-shop scheduling problems (PFSSP). The quantum population is merged with population produced by EDA with a comparative criterion to ensure that the best individual will remain from both populations. The EDA is integrated with standard QGA to produced fitter populations and guide QGA to find promising solution space. Utilizing the advantages of both algorithms, a faster and efficient algorithm is developed, which has produced better results than previous similar approaches for medium scale problems.
引用
收藏
页码:654 / 658
页数:5
相关论文
共 50 条
  • [1] A Compact Estimation of Distribution Algorithm for Solving Hybrid Flow-shop Scheduling Problem
    Wang, Shengyao
    Wang, Ling
    Xu, Ye
    PROCEEDINGS OF THE 10TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA 2012), 2012, : 649 - 653
  • [2] EDA algorithm with correlated variables for solving hybrid flow-shop scheduling problem
    Liu, Chang
    Li, Dong
    Peng, Hui
    Shi, Hai-Bo
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (04): : 1032 - 1039
  • [3] An Estimation of Distribution Algorithm for Permutation Flow-Shop Scheduling Problem
    Lemtenneche, Sami
    Bensayah, Abdallah
    Cheriet, Abdelhakim
    SYSTEMS, 2023, 11 (08):
  • [4] Scheduling of stochastic distributed hybrid flow-shop by hybrid estimation of distribution algorithm and proximal policy optimization
    Luo, Lin
    Yan, Xuesong
    EXPERT SYSTEMS WITH APPLICATIONS, 2025, 271
  • [5] Estimation of distribution algorithm for solving hybrid flow-shop scheduling problem with identical parallel machine
    Wang, Sheng-Yao
    Wang, Ling
    Xu, Ye
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2013, 19 (06): : 1304 - 1312
  • [6] An order-based estimation of distribution algorithm for stochastic hybrid flow-shop scheduling problem
    Wang, Sheng-yao
    Wang, Ling
    Liu, Min
    Xu, Ye
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2015, 28 (03) : 307 - 320
  • [7] An Estimation of Distribution Algorithm for Solving Hybrid Flow-shop Scheduling Problem with Stochastic Processing Time
    Wang Shengyao
    Wang Ling
    Xu Ye
    2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 2456 - 2461
  • [8] An Improved Heuristic Algorithm for a Hybrid Flow-shop Scheduling
    Dai, Min
    Tang, Dunbing
    Zheng, Kun
    Cai, Qixiang
    MEASUREMENT TECHNOLOGY AND ENGINEERING RESEARCHES IN INDUSTRY, PTS 1-3, 2013, 333-335 : 1414 - 1417
  • [9] A hybrid genetic algorithm for the flow-shop scheduling problem
    Tseng, Lin-Yu
    Lin, Ya-Tai
    ADVANCES IN APPLIED ARTICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4031 : 218 - 227
  • [10] Adaptive Genetic Algorithm for Hybrid Flow-shop Scheduling
    Zhu, Xiao Chun
    Zhao, Jian Feng
    Wang, Mu Lan
    MATERIALS PROCESSING AND MANUFACTURING III, PTS 1-4, 2013, 753-755 : 2925 - +