Multi-criteria risk assessment of a construction project

被引:47
|
作者
Tamosaitiene, Jolanta [1 ]
Zavadskas, Edmundas Kazimieras [1 ]
Turskis, Zenonas [1 ]
机构
[1] Vilnius Gediminas Tech Univ, Dept Construct Technol & Management, LT-10223 Vilnius, Lithuania
关键词
MCDM; fuzzy; civil engineering; risk; management; DECISION-MAKING MODEL; TOPSIS; SELECTION;
D O I
10.1016/j.procs.2013.05.018
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The paper presents risk assessment of construction objects for the project of commercial center construction. The risk assessment is based on the multi-criteria decision making methods with fuzzy information. The risk evaluation criteria are selected taking irk) consideration the macro, mezzo and micro levels of a construction project. Ranking of objects and determination of their optimality are determined by applying TOPSIS-F method with criteria values with fuzzy information. The background and presented criteria of construction project risk assessment of the proposed model arc provided and key findings from the analysis are presented. (C) 2013 The Authors, Published by Elsevier B,V, Selection and veer-review under responsibility of the organizers of the 2013 International Conference on Information Technology and Quantitative Management
引用
收藏
页码:129 / 133
页数:5
相关论文
共 50 条
  • [1] Multi-criteria risk assessment: Case study of a large hydroelectric project
    Ribas, Jose Roberto
    Arce, Maria Elena
    Sohler, Flavio Augusto
    Suarez-Garcia, Andres
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 227 : 237 - 247
  • [2] MULTI-CRITERIA ANALYSIS AND RISK ASSESSMENT
    OPPERHUIZEN, A
    HUTZINGER, O
    [J]. CHEMOSPHERE, 1982, 11 (07) : 675 - 678
  • [3] MULTI-CRITERIA ASSESSMENT OF LEAN MANAGEMENT TOOLS SELECTION IN CONSTRUCTION
    Nowotarski, P.
    Paslawski, J.
    Dallasega, P.
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2021, 67 (01) : 711 - 726
  • [4] Application of Multi-Criteria Assessment in Banking Risk Management
    Ristanovic, Vladimir
    Primorac, Dinko
    Mikic, Mihaela
    [J]. ZAGREB INTERNATIONAL REVIEW OF ECONOMICS & BUSINESS, 2023, 26 (01): : 97 - 117
  • [5] MULTI-CRITERIA DYNAMIC PROJECT PORTFOLIO
    Fiala, Petr
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE: QUANTITATIVE METHODS IN ECONOMICS: MULTIPLE CRITERIA DECISION MAKING XVIII, 2016, : 95 - 100
  • [6] MULTI-CRITERIA PROJECT PORTFOLIO OPTIMIZATION UNDER RISK AND SPECIFIC LIMITATIONS
    Fotr, Jiri
    Plevny, Miroslav
    Svecova, Lenka
    Vacik, Emil
    [J]. E & M EKONOMIE A MANAGEMENT, 2013, 16 (04): : 71 - 88
  • [7] Waste management project's alternatives: A risk-based multi-criteria assessment (RBMCA) approach
    Karmperis, Athanasios C.
    Sotirchos, Anastasios
    Aravossis, Konstantinos
    Tatsiopoulos, Ilias P.
    [J]. WASTE MANAGEMENT, 2012, 32 (01) : 194 - 212
  • [8] Multi-criteria decision analysis and environmental risk assessment for nanomaterials
    Linkov, Igor
    Satterstrom, F. Kyle
    Steevens, Jeffery
    Ferguson, Elizabeth
    Pleus, Richard C.
    [J]. JOURNAL OF NANOPARTICLE RESEARCH, 2007, 9 (04) : 543 - 554
  • [9] Framework and application of multi-criteria ship collision risk assessment
    Yu, Qing
    Teixeira, A. P.
    Liu, K.
    Soares, C. Guedes
    [J]. OCEAN ENGINEERING, 2022, 250
  • [10] Multi-criteria decision analysis and environmental risk assessment for nanomaterials
    Igor Linkov
    F. Kyle Satterstrom
    Jeffery Steevens
    Elizabeth Ferguson
    Richard C. Pleus
    [J]. Journal of Nanoparticle Research, 2007, 9 : 543 - 554