Improving concessionaire selection protocols in public/private partnered infrastructure projects

被引:36
|
作者
Zhang, XQ [1 ]
机构
[1] Yellow River Conservancy Comm, Zhengzhou 450003, Peoples R China
关键词
Financial factors; Infrastructure; Partnerships; Private sectors; Project management;
D O I
10.1061/(ASCE)0733-9364(2004)130:5(670)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A critical contributor to the success of a public/private partnered (PPP) infrastructure project is the selection of the right private-sector partner, the concessionaire, who would provide the best overall deal throughout the build-operate-transfer (BOT) development process. This paper proposes a core concessionaire selection protocol that incorporates public procurement principles, best-value selection approach, competitive selection process, and multicriteria tender evaluation. Key pointers for an improved concessionaire selection protocol are discussed and analyzed by drawing experience and learning lessons from worldwide PPP practices. These include improved project brief and tender documents, formulation of a best-value selection methodology, determination of suitable criteria and methods for prequalification and tender evaluation, capital structure (equity-to-debt ratio), financial models, and potential improvements in different stages of the concessionaire selection process. Relevant results of a questionnaire survey of international PPP expert opinions on an enhanced concessionaire selection protocol are also presented.
引用
收藏
页码:670 / 679
页数:10
相关论文
共 50 条
  • [1] Procurement protocols for public-private partnered projects
    Zhang, XQ
    Kumaraswamy, MM
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (05): : 351 - 358
  • [2] Selection model of concessionaire in PPP projects
    Wu, Qian
    Gao, Yanan
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2906 - 2910
  • [3] Evaluation of Public Private Partnership in Infrastructure Projects
    Loganathan, Karthikeyan
    Najafi, Mohammad
    Kaushal, Vinayak
    Agyemang, Pius
    [J]. PIPELINES 2021: PLANNING, 2021, : 151 - 159
  • [4] Private-sector partner selection for public-private partnership projects of electric vehicle charging infrastructure
    Zhang, Lihui
    Zhao, Zhenli
    Kan, Zhinan
    [J]. ENERGY SCIENCE & ENGINEERING, 2019, 7 (05) : 1469 - 1484
  • [5] Improving the Assessment of Economic Foreign Exchange Exposure in Public-Private Partnership Infrastructure Projects
    Ehrlich, Matthias
    Tiong, Robert L. K.
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2012, 18 (02) : 57 - 67
  • [6] Evaluating the risks of public private partnerships for infrastructure projects
    Grimsey, Darrin
    Lewis, Mervyn K.
    [J]. International Journal of Project Management, 2002, 20 (02) : 107 - 118
  • [7] Algorithm for the selection of public-private partnership projects for planning the resources allocation in road and transport infrastructure
    Buyvis, V. A.
    Yuryeva, E. Yu
    Novichikhin, A. V.
    [J]. INTERNATIONAL SCIENTIFIC AND RESEARCH CONFERENCE ON KNOWLEDGE-BASED TECHNOLOGIES IN DEVELOPMENT AND UTILIZATION OF MINERAL RESOURCES, 2019, 377
  • [8] Modelling country reliability in Public Private Partnership infrastructure projects
    Ehrlich, Matthias
    Kong, Robert Tiong Lee
    [J]. 25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 751 - 758
  • [9] Mechanisms for protecting returns on private investments in public infrastructure projects
    Demirel, Hatice Cigdem
    Leendertse, Wim
    Volker, Leentje
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2022, 40 (03) : 155 - 166
  • [10] Review of studies on the public private partnerships (PPP) for infrastructure projects
    Cui, Caiyun
    Liu, Yong
    Hope, Alex
    Wang, Jianping
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (05) : 773 - 794