A joint scheduling of production and distribution operations in a flow shop manufacturing system

被引:12
|
作者
Mohammadi, S. [1 ]
Cheraghalikhani, A. [1 ]
Ramezanian, R. [1 ]
机构
[1] KN Toosi Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Integrated modeling approach; Flow shop scheduling; distribution with routing; Imperialist competitive algorithm; IMPERIALIST COMPETITIVE ALGORITHM; JOB DELIVERY COORDINATION; COMMON DUE-DATE; BATCH DELIVERY; TRANSPORTATION CONSTRAINTS; EARLINESS-TARDINESS; HEURISTIC ALGORITHM; MINIMIZE EARLINESS; RELEASE DATES; MACHINE;
D O I
10.24200/sci.2017.4437
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In traditional scheduling problems and many real-world applications, the production operations are scheduled regardless of distribution decisions. Indeed, the completion time of a job in such problems is defined traditionally as the time when the production sequences of a job are finished. However, in many practical environments, completed orders are delivered to customers immediately after production stages without any further inventory storage. Therefore, in this paper, we investigate an integrated scheduling model of production and distribution problems simultaneously. It is assumed that products proceed through a permutation flow shop scheduling manufacturing system and are delivered to customers via available vehicles. The objective of our integrated model is to minimize the Maximum Returning Time (MRT), which is the time it takes for the last vehicle to deliver the last order to a relevant customer and return to production center. The problem is formulated mathematically, and then an Improved Imperialist Competitive Algorithm (I-ICA) is proposed for solving it. Furthermore, a sufficient number of test problems are generated for computational study. Various parameters of the algorithm are analyzed to calibrate the algorithm by means of the Taguchi method. At the end, the effectiveness of the proposed model and suggested algorithm is evaluated through a computational study where the obtained results show the appropriate performance of the integrated model and solving approach in comparison to those of the other algorithms. (C) 2018 Sharif University of Technology. All rights reserved.
引用
收藏
页码:911 / 930
页数:20
相关论文
共 50 条
  • [1] A production scheduling system in a hybrid flow shop
    Uetake, T
    Tsubone, H
    Ohba, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 41 (1-3) : 395 - 398
  • [2] PRODUCTION AND SCHEDULING SYSTEM IN THE FLOW-SHOP
    TSUBONE, H
    TANAKA, T
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (06): : 608 - 611
  • [3] Scheduling for a flow shop with waiting time constraints and missing operations in semiconductor manufacturing
    Han, Jun-Hee
    Lee, Ju-Yong
    [J]. ENGINEERING OPTIMIZATION, 2023, 55 (10) : 1742 - 1759
  • [4] Joint scheduling of machines and AGVs in green hybrid flow shop with missing operations
    Geng, Kai-Feng
    Ye, Chun-Ming
    [J]. Kongzhi yu Juece/Control and Decision, 2022, 37 (10): : 2723 - 2732
  • [5] Research on a main-branch Hybrid Flow Shop Scheduling Problem in Production Manufacturing System
    Zhang, Xinmin
    Zhang, Mengyue
    [J]. ADVANCED RESEARCH ON APPLIED MECHANICS AND MANUFACTURING SYSTEM, 2013, 252 : 354 - 359
  • [6] A flow-shop manufacturing scheduling system with interactive computer graphics
    Onwubolu, GC
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1996, 16 (09) : 74 - &
  • [7] Online Scheduling of Flexible Flow Shop Manufacturing
    Weng, Wei
    Fujimura, Shigeru
    [J]. INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 112 - 116
  • [8] Production improvement with flow shop scheduling heuristics in Household utensils manufacturing company
    Wolde, Micheal G.
    Berhan, Eshetie
    Jilcha, Kassu
    [J]. COGENT ENGINEERING, 2018, 5 (01):
  • [9] A Scheduling Algorithm for On-Time Production in A Hybrid Flow Shop Manufacturing Process
    Lee, Junhee
    Yoon, Young Seog
    Park, Kwangroh
    [J]. 2019 10TH INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGY CONVERGENCE (ICTC): ICT CONVERGENCE LEADING THE AUTONOMOUS FUTURE, 2019, : 1243 - 1247
  • [10] A Multi-Agent Scheduling Approach for the Joint Scheduling of Jobs and Maintenance Operations in the Flow Shop Sequencing Problem
    Khelifati, Si Larabi
    Benbouzid-Sitayeb, Fatima
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT II: THIRD INTERNATIONAL CONFERENCE, ICCCI 2011, 2011, 6923 : 60 - 69