Multi-Objective Optimization of Integrated Process Planning and Scheduling Considering Energy Savings

被引:13
|
作者
Zhang, Xu [1 ]
Zhang, Hua [2 ]
Yao, Jin [3 ]
机构
[1] Sichuan Univ, Business Sch, Chengdu 610064, Peoples R China
[2] Zhaoqing Univ, Sch Econ & Management, Zhaoqing 526061, Peoples R China
[3] Sichuan Univ, Sch Mech Engn, Chengdu 610064, Peoples R China
关键词
integrated process planning and scheduling; energy consumption; multi-objective optimization; genetic algorithm; FLEXIBLE JOB-SHOP; GENETIC ALGORITHM; CARBON FOOTPRINT; PROCESS PLANS; SYSTEM; CONSUMPTION; EFFICIENCY;
D O I
10.3390/en13236181
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
With the emergence of the concept of green manufacturing, more manufacturers have attached importance to energy consumption indicators. The process planning and shop scheduling procedures involved in manufacturing processes can both independently achieve energy savings, however independent optimization approaches limit the optimization space. In order to achieve a better optimization effect, the optimization of energy savings for integrated process planning and scheduling (IPPS) was studied in this paper. A mathematical model for multi-objective optimization of IPPS was established to minimize the total energy consumption, makespan, and peak power of the job shop. A hierarchical multi-strategy genetic algorithm based on non-dominated sorting (NSHMSGA) was proposed to solve the problem. This algorithm was based on the non-dominated sorting genetic algorithm II (NSGA-II) framework, in which an improved hierarchical coding method is used, containing a variety of genetic operators with different strategies, and in which a population degradation mechanism based on crowding distance is adopted. The results from the case study in this paper showed that the proposed method reduced the energy consumption by approximately 15% for two different scheduling schemes with the same makespan. The computational results for NSHMSGA and NSGA-II approaches were evaluated quantitatively in the case study. The C-metric values for NSHMSGA and NSGA-II were 0.78 and 0, the spacing metric values were 0.4724 and 0.5775, and the maximum spread values were 1.6404 and 1.3351, respectively. The evaluation indexes showed that the NSHMSGA approach could obtain a better non-dominated solution set than the NSGA-II approach in order to solve the multi-objective IPPS problem proposed in this paper.
引用
收藏
页数:31
相关论文
共 50 条
  • [1] Multi-objective Optimization Scheduling Method for Integrated Energy System Considering Uncertainty
    Xiao, Jie
    Kong, Xiangyu
    Liu, Dehong
    Li, Ye
    Dong, Delong
    Qiao, Yanan
    [J]. 2019 22ND INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS (ICEMS 2019), 2019, : 1913 - 1917
  • [2] A Priority Based Optimization Algorithm for Multi-objective Integrated Process Planning and Scheduling Problem
    Ausaf, Muhammad Farhan
    Li, Xinyu
    Liang, Gao
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 1327 - 1331
  • [3] A multi-objective memetic algorithm for integrated process planning and scheduling
    Jin, Liangliang
    Zhang, Chaoyong
    Shao, Xinyu
    Yang, Xudong
    Tian, Guangdong
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 85 (5-8): : 1513 - 1528
  • [4] A multi-objective memetic algorithm for integrated process planning and scheduling
    Liangliang Jin
    Chaoyong Zhang
    Xinyu Shao
    Xudong Yang
    Guangdong Tian
    [J]. The International Journal of Advanced Manufacturing Technology, 2016, 85 : 1513 - 1528
  • [5] Integrated multi-objective process planning and flexible job shop scheduling considering precedence constraints
    Shokouhi, Elahe
    [J]. PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2018, 6 (01): : 61 - 89
  • [6] Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm
    Muhammad Farhan AUSAF
    Liang GAO
    Xinyu LI
    [J]. Frontiers of Mechanical Engineering., 2015, 10 (04) - 404
  • [7] Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm
    Ausaf M.F.
    Gao L.
    Li X.
    [J]. Frontiers of Mechanical Engineering, 2015, 10 (4) : 392 - 404
  • [8] Multi-layer collaborative optimization method for solving fuzzy multi-objective integrated process planning and scheduling
    Wen, Xiaoyu
    Lian, Xiaonan
    Wang, Kanghong
    Li, Hao
    Luo, Guofu
    [J]. MEASUREMENT & CONTROL, 2020, 53 (9-10): : 1883 - 1901
  • [9] Multi-objective grasshopper optimization algorithm for optimal energy scheduling by considering heat as integrated demand response
    Han, Junyan
    Vartosh, Aris
    [J]. APPLIED THERMAL ENGINEERING, 2023, 234
  • [10] Multi-objective optimization of integrated energy system considering installation configuration
    Qiao, Yiyang
    Hu, Fan
    Xiong, Wen
    Guo, Zihao
    Zhou, Xiaoguang
    Li, Yajun
    [J]. ENERGY, 2022, 263