Risk-based water resources planning: Incorporating probabilistic nonstationary climate uncertainties

被引:87
|
作者
Borgomeo, Edoardo [1 ]
Hall, Jim W. [1 ]
Fung, Fai [2 ]
Watts, Glenn [2 ]
Colquhoun, Keith [3 ]
Lambert, Chris [3 ]
机构
[1] Univ Oxford, Environm Change Inst, Oxford, England
[2] Environm Hyg Agcy, Bristol, Avon, England
[3] Thames Water, Reading, Berks, England
基金
英国自然环境研究理事会; 英国工程与自然科学研究理事会;
关键词
risk-based water resources planning; probabilistic climate projections; London water supply; frequency of water shortage; WILLINGNESS-TO-PAY; CHANGE IMPACT; RIVER FLOW; QUANTIFYING UNCERTAINTY; MULTIMODEL ENSEMBLE; WEATHER GENERATOR; MODEL PARAMETERS; UK; VULNERABILITY; PERFORMANCE;
D O I
10.1002/2014WR015558
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
We present a risk-based approach for incorporating nonstationary probabilistic climate projections into long-term water resources planning. The proposed methodology uses nonstationary synthetic time series of future climates obtained via a stochastic weather generator based on the UK Climate Projections (UKCP09) to construct a probability distribution of the frequency of water shortages in the future. The UKCP09 projections extend well beyond the range of current hydrological variability, providing the basis for testing the robustness of water resources management plans to future climate-related uncertainties. The nonstationary nature of the projections combined with the stochastic simulation approach allows for extensive sampling of climatic variability conditioned on climate model outputs. The probability of exceeding planned frequencies of water shortages of varying severity (defined as Levels of Service for the water supply utility company) is used as a risk metric for water resources planning. Different sources of uncertainty, including demand-side uncertainties, are considered simultaneously and their impact on the risk metric is evaluated. Supply-side and demand-side management strategies can be compared based on how cost-effective they are at reducing risks to acceptable levels. A case study based on a water supply system in London (UK) is presented to illustrate the methodology. Results indicate an increase in the probability of exceeding the planned Levels of Service across the planning horizon. Under a 1% per annum population growth scenario, the probability of exceeding the planned Levels of Service is as high as 0.5 by 2040. The case study also illustrates how a combination of supply and demand management options may be required to reduce the risk of water shortages.
引用
收藏
页码:6850 / 6873
页数:24
相关论文
共 50 条
  • [1] Towards risk-based water resources planning in England and Wales under a changing climate
    Hall, J. W.
    Watts, G.
    Keil, M.
    de Vial, L.
    Street, R.
    Conlan, K.
    O'Connell, P. E.
    Beven, K. J.
    Kilsby, C. G.
    [J]. WATER AND ENVIRONMENT JOURNAL, 2012, 26 (01) : 118 - 129
  • [2] Incorporating probabilistic seasonal climate forecasts into river management using a risk-based framework
    Towler, Erin
    Roberts, Mike
    Rajagopalan, Balaji
    Sojda, Richard S.
    [J]. WATER RESOURCES RESEARCH, 2013, 49 (08) : 4997 - 5008
  • [3] Risk-based water resources planning in practice: a blueprint for the water industry in England
    Hall, Jim W.
    Mortazavi-Naeini, Mohammad
    Borgomeo, Edoardo
    Baker, Bill
    Gavin, Helen
    Gough, Meyrick
    Harou, Julien J.
    Hunt, Douglas
    Lambert, Chris
    Piper, Ben
    Richardson, Nathan
    Watts, Glenn
    [J]. WATER AND ENVIRONMENT JOURNAL, 2020, 34 (03) : 441 - 454
  • [4] A risk-based interactive multi-stage stochastic programming approach for water resources planning under dual uncertainties
    Wang, Y. Y.
    Huang, G. H.
    Wang, S.
    Li, W.
    Guan, P. B.
    [J]. ADVANCES IN WATER RESOURCES, 2016, 94 : 217 - 230
  • [5] The effects of climate model similarity on probabilistic climate projections and the implications for local, risk-based adaptation planning
    Steinschneider, Scott
    McCrary, Rachel
    Mearns, Linda O.
    Brown, Casey
    [J]. GEOPHYSICAL RESEARCH LETTERS, 2015, 42 (12) : 5014 - 5022
  • [6] Comparisons of Risk-based Decision Rules for the Application of Water Resources Planning and Management
    Hsin-Ting SU
    Yeou-Koung Tung
    [J]. Water Resources Management, 2014, 28 : 3921 - 3935
  • [7] Comparisons of Risk-based Decision Rules for the Application of Water Resources Planning and Management
    Su, Hsin-Ting
    Tung, Yeou-Koung
    [J]. WATER RESOURCES MANAGEMENT, 2014, 28 (12) : 3921 - 3935
  • [8] Risk-based water resources planning in England and Wales: challenges in execution and implementation
    Turner, S. W. D.
    Blackwell, R. J.
    Smith, M. A.
    Jeffrey, P. J.
    [J]. URBAN WATER JOURNAL, 2016, 13 (02) : 182 - 197
  • [9] Incorporating Climate Change Into Water Resources Planning in England and Wales
    Arnell, Nigel W.
    [J]. JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2011, 47 (03): : 541 - 549
  • [10] Risk-based Theory of Risk Assessment of Urban Water Resources
    Chen Peng
    Zhang Jiquan
    Ji Yu
    Jiang Xinyu
    Tong Zhijun
    [J]. CHINESE PERSPECTIVE ON RISK ANALYSIS AND CRISIS RESPONSE, 2010, 13 : 544 - +