Design on Control System of Automatic Test Line for Meter
被引:0
|
作者:
Wang Yi
论文数: 0引用数: 0
h-index: 0
机构:
Huazhong Univ Sci & Technol, Dept Control Sci & Engn, Wuhan 430074, Peoples R ChinaHuazhong Univ Sci & Technol, Dept Control Sci & Engn, Wuhan 430074, Peoples R China
Wang Yi
[1
]
Yuan Tianqi
论文数: 0引用数: 0
h-index: 0
机构:
North China Inst Water Resources & Elect Power, Inst Resources & Environm, Zhengzhou 450011, Peoples R ChinaHuazhong Univ Sci & Technol, Dept Control Sci & Engn, Wuhan 430074, Peoples R China
Yuan Tianqi
[2
]
Xiao Jiangwen
论文数: 0引用数: 0
h-index: 0
机构:
Huazhong Univ Sci & Technol, Dept Control Sci & Engn, Wuhan 430074, Peoples R ChinaHuazhong Univ Sci & Technol, Dept Control Sci & Engn, Wuhan 430074, Peoples R China
Xiao Jiangwen
[1
]
机构:
[1] Huazhong Univ Sci & Technol, Dept Control Sci & Engn, Wuhan 430074, Peoples R China
[2] North China Inst Water Resources & Elect Power, Inst Resources & Environm, Zhengzhou 450011, Peoples R China
The testing of meter works each year, the worker do the same work every day, and manual operation may bring a lot of errors. If there is a pipeline doing verification-related work automatic will greatly enhance the quality and efficiency of the test. This paper based on a company's actual project about meter test line background, discusses and describes the method of the control system's design and implementation; it focuses on how to interact about the software and hardware system. This can be provided as a reference for the designing of metering device's intelligent testing system.