Model of a Maturity Capsule in Managing IT Projects

被引:0
|
作者
Kowalczuk, Zdzislaw [1 ]
Orlowski, Cezary [2 ]
机构
[1] Gdansk Univ Technol, Fac Elect Telecommun & Informat, PL-80233 Gdansk, Poland
[2] IBM Ctr Adv Studies Campus, Gdansk, Poland
关键词
IT management; method selection; Client; verification processes; decision-making support; enterprise architecture; maturity; information technology; project negentropy; provider; software environment; supplier; technology selection; data processing; mathematical modeling;
D O I
10.1080/01969722.2014.874809
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The main purpose of this article is to present a report on the development of a model of information technology management (MITM). This model is an answer to the need to support decision making in the selection of methods and information technologies. This article presents a multisequential model (MSM) of technology selection and a model for initial processing procedures (IPP) necessary for the MITM model. The presentation of the construction stages of both models is followed by a discussion on their verification processes in an environment of enterprise architecture development. Aggregated (within the process of IPP) variables are applied, such as the maturity of the client (C) and the provider/supplier (S), as well as the project negentropy (P), which is a measure of the project development state. Next, the concept of an integrated maturity capsule (C-S-P) is introduced. The work concludes with the authors' observations, concerning mainly the purposefulness of using decision-making models in the management of information technology projects but also on the applicability of the methods of modeling such projects.
引用
收藏
页码:123 / 135
页数:13
相关论文
共 50 条
  • [1] A model of client maturity assessment for IT projects
    Wozniak, Monika
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ICT MANAGEMENT FOR GLOBAL COMPETITIVENESS AND ECONOMIC GROWTH IN EMERGING ECONOMIES (ICTM 2016), 2016, : 139 - 153
  • [2] Managing Complex Projects: A New Model
    Dalcher, Darren
    PROJECT MANAGEMENT JOURNAL, 2009, 40 (03) : 83 - 83
  • [3] The Use of an Ontotrigger for Designing the Ontology of a Model Maturity Capsule
    Orlowski, Cezary
    Kaplanski, Pawel
    Ngoc-Thanh Nguyen
    Pietranik, Marcin
    INTERNATIONAL JOURNAL OF SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING, 2016, 26 (05) : 715 - 731
  • [4] Communication maturity model for organizations realizing EU projects
    Muszynska, Karolina
    KNOWLEDGE-BASED AND INTELLIGENT INFORMATION & ENGINEERING SYSTEMS (KES-2018), 2018, 126 : 2184 - 2193
  • [5] Application of the maturity model for collaborative scheduling for construction projects
    Scala, Natalie M.
    Alves, Thais da Costa Lago
    Hawkins, Dominique
    Schiavone, Vincent
    Liu, Min
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [6] Requirements Engineering Method and Maturity Model for ERP Projects
    Parthasarathy, S.
    Ramachandran, Muthu
    INTERNATIONAL JOURNAL OF ENTERPRISE INFORMATION SYSTEMS, 2008, 4 (04) : 1 - 14
  • [7] Towards a Maturity Model for the Assessment of Ideation in Crowdsourcing Projects
    Boughzala, Imed
    de Vreede, Triparna
    Cuong Nguyen
    de Vreede, Gert-Jan
    2014 47TH HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES (HICSS), 2014, : 483 - 490
  • [8] Cost information model for managing multiple projects
    Kim, Chul S.
    Liu, Liang Y.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2007, 133 (12): : 966 - 974
  • [9] A competency model for effectiveness in managing multiple projects
    School of Technology Management, Stevens Institute of Technology, Castle Point on Hudson, Hoboken, NJ 07030, United States
    不详
    J. High Technol. Manage. Res., 2008, 2 (118-131):
  • [10] Managing Security Projects: Proposition of a Cost Model
    Sadok, M.
    INFORMATION SYSTEMS: PEOPLE, ORGANIZATIONS, INSTITUTIONS, AND TECHNOLOGIES, 2010, : 237 - 244