Production control problem integrating overhaul and subcontracting strategies for a quality deteriorating manufacturing system

被引:32
|
作者
Rivera-Gomez, Hector [1 ]
Gharbi, Ali [2 ]
Kenne, Jean-Pierre [3 ]
Montano-Arango, Oscar [1 ]
Hernandez-Gress, Eva Selene [1 ]
机构
[1] Autonomous Univ Hidalgo, Acad Area Engn, Mineral De La Reforma 42184, Hgo, Mexico
[2] Univ Quebec, Automated Prod Engn Dept, Prod Syst Design & Control Lab, Ecole Technol Super, Montreal, PQ H3C 1K3, Canada
[3] Univ Quebec, Dept Mech Engn, Lab Integrated Prod Tehcnol, Ecole Technol Super, Montreal, PQ H3C 1K3, Canada
基金
英国医学研究理事会;
关键词
Quality; Manufacturing system; Production; Subcontracting; Deteriorating systems; MAINTENANCE CONTROL; DESIGN; POLICY; REPAIR/REPLACEMENT; SUBJECT;
D O I
10.1016/j.ijpe.2015.10.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study an unreliable deteriorating manufacturing system that produces conforming and non-conforming parts to satisfy a constant demand product rate. The manufacturing system is comprised of a failure-prone machine. Due to the combined effect of random availability variations and deterioration, the system is not able to fulfill long-term product demand. In particular, when finished goods inventory is positive, clients demand are fulfilled on-time and without delay. When backlog exists, subcontracting options are available at a higher cost to supplement the limited production capacity of the manufacturing system. The effect of deterioration is observed mainly in the quality of the parts produced, since the rate of defectives increases as the machines deteriorate. Overhaul activities can be conducted to mitigate the effect of deterioration. We propose a joint feedback control policy based on a stochastic dynamic programming formulation which aims simultaneously to determine the production and overhaul rates, and the rate at which subcontractors are requested. The proposed joint control policy minimizes the total cost, including the inventory, backlog, repair, overhaul, defectives, production and subcontracting costs, over an infinite planning horizon. To determine the optimal control parameters, we adopt a numerical scheme to solve the optimality equations and a numerical example is presented as an illustration of the approach. The structure of the joint control policy is validated through an extensive sensitivity analysis. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:134 / 150
页数:17
相关论文
共 50 条
  • [1] Production and quality control policies for deteriorating manufacturing system
    Rivera-Gomez, Hector
    Gharbi, Ali
    Kenne, Jean Pierre
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (11) : 3443 - 3462
  • [2] Production and subcontracting control for an unreliable manufacturing system with setups
    Assid, M.
    Gharbi, A.
    Hajji, A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (12) : 3570 - 3588
  • [3] Subcontracting strategies with production and maintenance policies for a manufacturing system subject to progressive deterioration
    Rivera-Gomez, Hector
    Gharbi, Ali
    Kenne, Jean-Pierre
    Montano-Arango, Oscar
    Selene Hernandez-Gress, Eva
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 200 : 103 - 118
  • [4] Optimal joint production, maintenance and product quality control policies for a continuously deteriorating manufacturing system
    Pongha, Patrick Megoze
    Kenne, Jean-Pierre
    Garcia, Edgar De Jesus
    Hof, Lucas A.
    [J]. INTERNATIONAL JOURNAL OF MODELLING AND SIMULATION, 2023, 43 (03): : 135 - 152
  • [5] Temporal Problem of Subcontracting of Manufacturing Unit under Joint Production Control and Maintenance Policy
    Dahane, M.
    Clementz, C.
    Rezg, N.
    [J]. 2009 IEEE CONFERENCE ON EMERGING TECHNOLOGIES & FACTORY AUTOMATION (EFTA 2009), 2009,
  • [6] Production and uncertain green subcontracting control for an unreliable manufacturing system facing emissions
    Ben-Salem, A.
    Gharbi, A.
    Hajji, A.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 83 (9-12): : 1787 - 1799
  • [7] Production and uncertain green subcontracting control for an unreliable manufacturing system facing emissions
    A. Ben-Salem
    A. Gharbi
    A. Hajji
    [J]. The International Journal of Advanced Manufacturing Technology, 2016, 83 : 1787 - 1799
  • [8] Integrated control policy of production and preventive maintenance for a deteriorating manufacturing system
    Kang, Kaican
    Subramaniam, Velusamy
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 118 : 266 - 277
  • [9] Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality
    Rivera-Gomez, Hector
    Gharbi, Ali
    Kenne, Jean Pierre
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) : 575 - 587
  • [10] Production and replacement policies for a deteriorating manufacturing system under random demand and quality
    Ouaret, Samir
    Kenne, Jean-Pierre
    Gharbi, Ali
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (02) : 623 - 636