Job scheduling in Grid batch farms

被引:1
|
作者
Gellrich, Andreas [1 ]
机构
[1] DESY, D-22607 Hamburg, Germany
关键词
D O I
10.1088/1742-6596/513/3/032038
中图分类号
O57 [原子核物理学、高能物理学];
学科分类号
070202 ;
摘要
We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] A Hybrid Batch Job Scheduling Algorithm For Grid Environment
    Zahedani, Shirin Dehghani
    Dastghaibyfard, GholamHossin
    [J]. 2014 4TH INTERNATIONAL CONFERENCE ON COMPUTER AND KNOWLEDGE ENGINEERING (ICCKE), 2014, : 763 - 768
  • [2] Job Scheduling in a Grid Cluster
    Skenteridou, Kyriaki
    Karatza, Helen D.
    [J]. 2015 INTERNATIONAL CONFERENCE ON COMPUTER, INFORMATION AND TELECOMMUNICATION SYSTEMS (CITS), 2015,
  • [3] A Job Scheduling Framework for Large Computing Farms
    Capannini, Gabriele
    Baraglia, Ranieri
    Puppin, Diego
    Ricci, Laura
    Pasquali, Marco
    [J]. 2007 ACM/IEEE SC07 CONFERENCE, 2010, : 390 - +
  • [4] Optimizing job scheduling in the Grid environment
    Xia, E
    Jurisica, I
    [J]. PROCEEDINGS OF THE 7TH JOINT CONFERENCE ON INFORMATION SCIENCES, 2003, : 447 - 451
  • [5] SCHEDULING IN A BATCH OR JOB SHOP PRODUCTION ENVIRONMENT
    BROWNE, J
    OKELLY, MEJ
    DAVIES, BJ
    [J]. ENGINEERING MANAGEMENT INTERNATIONAL, 1982, 1 (03): : 173 - 184
  • [6] A method for job scheduling in Grid based on job execution status
    Lorincz, Laszlo Csaba
    Kozsik, Tamas
    Ulbert, Attila
    Horvath, Zoltan
    [J]. MULTIAGENT AND GRID SYSTEMS, 2005, 1 (03) : 197 - 208
  • [7] Autonomic job scheduling policy for grid computing
    Abawajy, JH
    [J]. COMPUTATIONAL SCIENCE - ICCS 2005, PT 3, 2005, 3516 : 213 - 220
  • [8] A Heuristic on Job Scheduling in Grid Computing Environment
    Baghban, Hojjat
    Rahmani, Amir Masoud
    [J]. GCC 2008: SEVENTH INTERNATIONAL CONFERENCE ON GRID AND COOPERATIVE COMPUTING, PROCEEDINGS, 2008, : 141 - +
  • [9] Improving job scheduling algorithms in a grid environment
    Lee, Yun-Han
    Leu, Seiven
    Chang, Ruay-Shiung
    [J]. FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2011, 27 (08): : 991 - 998
  • [10] Benefits of global grid computing for job scheduling
    Ernemann, C
    Hamscher, V
    Yahyapour, R
    [J]. FIFTH IEEE/ACM INTERNATIONAL WORKSHOP ON GRID COMPUTING, PROCEEDINGS, 2004, : 374 - 379