Case-based reasoning in scheduling: reusing solution components

被引:44
|
作者
Cunningham, P
Smyth, B
机构
[1] Department of Computer Science, Trinity College Dublin, College Green, Dublin
[2] Department of Computer Science, University College Dublin, Dublin, Belfield
关键词
D O I
10.1080/002075497194237
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we explore the reuse of components of known good schedules in new scheduling problems. This involves accumulating a case-base of good quality schedules, retrieving a case (or cases) similar to a new scheduling problem and building a new schedule from components of the retrieved cases. We start by introducing the components of case-based reasoning' (CBR) and we describe a CBR solution to a 'travelling salesman problem' in order to illustrate the use of CBR in optimization problems Two CBR solutions to a single machine scheduling problem with sequence dependent setup times are described: These are evaluated by comparing them with two more conventional alternative techniques-simulated annealed and myopic search. Both CBR techniques are shown to provide good quality solutions quickly.
引用
收藏
页码:2947 / 2961
页数:15
相关论文
共 50 条
  • [1] Case-based reasoning in scheduling
    MacCarthy, BL
    Jou, P
    [J]. ADVANCED MANUFACTURING PROCESSES, SYSTEMS, AND TECHNOLOGIES (AMPST 96), 1996, : 211 - 218
  • [2] Using case-based reasoning for reusing software knowledge
    Tautz, C
    Althoff, KD
    [J]. CASE-BASED REASONING RESEARCH AND DEVELOPMENT, 1997, 1266 : 156 - 165
  • [3] Case-based reasoning for production scheduling
    Schmidt, G
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 56-7 : 537 - 546
  • [4] Components for case-based reasoning systems
    Abásolo, C
    Plaza, E
    Arcos, JL
    [J]. TOPICS IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2002, 2504 : 1 - 16
  • [5] Case-based CBR: Capturing and reusing reasoning about case adaptation
    Leake, DB
    Kinley, A
    Wilson, D
    [J]. INTERNATIONAL JOURNAL OF EXPERT SYSTEMS, 1997, 10 (02): : 197 - 213
  • [6] A case-based reasoning approach for production scheduling
    Schmidt, G
    Meyer, J
    [J]. WIRTSCHAFTSINFORMATIK, 1996, 38 (01): : 57 - 60
  • [7] A hybrid case-based reasoning approach to detecting the optimal solution in nurse scheduling problem
    Simic, Svetlana
    Milutinovic, Dragana
    Sekulic, Slobodan
    Simic, Dragan
    Simic, Svetislav D.
    Dordevic, Jovanka
    [J]. LOGIC JOURNAL OF THE IGPL, 2020, 28 (02) : 226 - 238
  • [8] CaBMA: a case-based reasoning system for capturing, refining, and reusing project plans
    Ke Xu
    Hèctor Muñoz-Avila
    [J]. Knowledge and Information Systems, 2008, 15 : 215 - 232
  • [9] CaBMA:: a case-based reasoning system for capturing, refining, and reusing project plans
    Xu, Ke
    Munoz-Avila, Hector
    [J]. KNOWLEDGE AND INFORMATION SYSTEMS, 2008, 15 (02) : 215 - 232
  • [10] A case-based reasoning system for tacit knowledge transferring & reusing within projects
    Li Min-jie
    Cheng Tie-xin
    [J]. PROCEEDINGS OF THE NINTH WEST LAKE INTERNATIONAL CONFERENCE ON SMALL AND MEDIUM BUSINESS (WLICSMB), 2008, : 144 - 149