Customer interruption costs (CICs) for network capital investments

被引:0
|
作者
Mushwana, C.
Pillay, D.
机构
关键词
customer interruption costs; value-based reliability planning;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Investments in network expansion are driven by the cost to the customer and the supplier of electricity. Network reliability is a major issue when considering network expansion. Unreliable networks result in unnecessary interruption of customers, and even network collapse. The restructuring of the electricity supply industry results in poor network reliability due to lack of understanding by the distributors of the criticality of reliability and network investment criteria. When considering network investments, for a project to be economically justifiable, the total cost for installing the new infrastructure should be less than the cost to interrupt the customer. For this criterion to be applied, customer interruption costs (CICs) are critical. This paper reviews the application of CICs in capital investment, highlighting the criticality of the CIC figures. Different methodologies are reviewed, and a recommendation is made in light of a restructured electrical industry.
引用
收藏
页码:229 / 233
页数:5
相关论文
共 50 条
  • [1] Application of customer interruption costs in transmission network reliability planning
    Chowdhury, AA
    Koval, DO
    [J]. 2001 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS TECHNICAL CONFERENCE, CONFERENCE RECORD, 2001, : 53 - 60
  • [2] Application of customer interruption costs in transmission network reliability planning
    Chowdhury, AA
    Koval, DO
    [J]. IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2001, 37 (06) : 1590 - 1596
  • [3] Discussion of "Application of customer interruption costs in transmission network reliability planning"
    Hsu, SM
    [J]. IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2002, 38 (05) : 1160 - 1160
  • [4] Closure to discussion of "Application of customer interruption costs in transmission network reliability planning"
    Chowdhury, AA
    Koval, DO
    [J]. IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2002, 38 (05) : 1161 - 1161
  • [5] Incorporating Customer Interruption Costs Into Reliability Planning
    Schellenberg, Josh A.
    Sullivan, Michael J.
    Eto, Joe H.
    [J]. 2014 IEEE RURAL ELECTRIC POWER CONFERENCE (REPC), 2014,
  • [6] A method for dynamic economic dispatch considering network security constraints and customer interruption costs
    Yang, Ming
    Han, Xueshan
    Liang, Jun
    Zhang, Li
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2009, 33 (14): : 27 - 31
  • [7] Evaluation of interruption costs for general public customer in Korea
    Choi, S. B.
    Nam, K. Y.
    Jeong, S. H.
    Kim, D. K.
    Lee, J. D.
    Rhoo, H. S.
    [J]. 2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 760 - +
  • [8] Customer Interruption Costs Calculation of Finnish Electricity Customers
    Kufeoglu, Sinan
    Prittinen, Samuel
    Lehtonen, Matti
    [J]. 2015 12TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2015,
  • [9] Integrating Customer Interruption Costs into Outage Management Systems
    Schellenberg, Josh
    Speckman, Barney
    Eto, Joseph H.
    [J]. 2016 IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION (T&D), 2016,
  • [10] Interruption costs, customer satisfaction and expectations for service reliability
    Sullivan, MJ
    Vardell, T
    Suddeth, BN
    Vojdani, A
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) : 989 - 995