Tailings Pond Life Cycle Safety Management System

被引:2
|
作者
Li, Quanming [1 ]
Zhang, Hong [2 ]
Li, Gang [1 ]
机构
[1] China Acad Safety & Sci & Technol, Beijing, Peoples R China
[2] North China Inst Sci & Technol, Fac Safety Engn, Langfang, Peoples R China
基金
中国国家自然科学基金;
关键词
tailings pond; sustainable development; life cycle; safety management; China; Australia; Canada;
D O I
10.15273/gree.2017.02.018
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
China, a globally recognized major mining country, holds one of the largest quantities of tailings pond country in the world. The total number of mines in China has been ranked first in the world. It is a major concern for Chinese safety management to give great importance for tailings pond safety, stability and sustainable development. For the past few years, China has increased efforts to investigate and govern discrete issues of tailings and to carry out a series of special renovation and comprehensive treatment actions to improve safety management levels and to decrease the likelihood of tailings pond accidents. In the end of 2015, China successfully eliminated hazardous tailings ponds and dangerous tailings ponds. Moreover, the total number of tailings decreased from 12,273 to 8,869. However, there are still 1,425 "head-top" tailings that threaten the lower masses' safety. This greatly signifies the Chinese tailings pond safety, stability as well as sustainable development. In turn, this may improve the Chinese tailings life cycle safety management system and help reach the goal of attaining closed-loop management in the tailings pond life cycle. Based on the summary of the tailings pond accidents in both China and other countries from 1961 to 2015, and by analyzing the types and causes of accident, this paper investigated the successful experiences and effective measurements of British Columbia (Canada) and Australia in the tailings pond life cycle safety management. This paper summed up each country's tailings life cycle safety management requirements and analysed the characteristics and differences of tailings safety management by comparing 5 aspects. tailings life cycle safety management process, main design parameter, construction requirements, monitoring, and the tailings pond closing management. Based on these observations, this paper suggests some measurements to improve the tailings pond life cycle safety management in China, such as strengthening tailings pond safety management, improving tailings classification, increasing design parameter values, establishing mine reclamation fund, and so on.
引用
收藏
页码:95 / 100
页数:6
相关论文
共 50 条
  • [1] Management method for closed tailings pond and flood control safety evaluation
    Jin, Songli
    Gao, Denghui
    Zhang, Renzhuo
    Ma, Junteng
    Li, Quanming
    [J]. JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2024, 24 (4-5) : 2071 - 2083
  • [2] The discussion about the safety management of the mine tailings pond near the mine stope
    Lv Shuran
    Lv Shujin
    [J]. ISMSSE 2011, 2011, 26
  • [3] Life cycle assessment of mine tailings management in Canada
    Reid, Catherine
    Becaert, Valerie
    Aubertin, Michel
    Rosenbaum, Ralph K.
    Deschenes, Louise
    [J]. JOURNAL OF CLEANER PRODUCTION, 2009, 17 (04) : 471 - 479
  • [4] An Integrated Project Management Life Cycle Supporting System Safety
    Tschuertz, Hans
    Schedl, Gabriele
    [J]. MAKING SYSTEMS SAFER, 2010, : 71 - +
  • [5] The present situation and prospects for safety online-monitoring system of tailings pond
    Zhou Hanmin
    Yuan Ziqing
    Su Jun
    Yang Xiaocong
    Zhang Da
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MECHATRONICS, ROBOTICS AND AUTOMATION (ICMRA 2015), 2015, 15 : 474 - 481
  • [6] TAILINGS POND AS A WASTE TREATMENT SYSTEM
    BELL, AV
    [J]. CIM BULLETIN, 1974, 67 (744): : 73 - 78
  • [7] System Safety Management of Whole Life Cycle of Chemical Process Unit
    SANG Shansong
    LIU Xinshang
    [J]. International Journal of Plant Engineering and Management, 2020, 25 (01) : 14 - 23
  • [8] A safety assessment of the new Xiangyun phosphogypsum tailings pond
    Wang, T.
    Zhou, Y.
    Lv, Q.
    Zhu, Yuanle
    Jiang, C.
    [J]. MINERALS ENGINEERING, 2011, 24 (10) : 1084 - 1090
  • [9] An Integrated Management System of Man-machine Communication for Tailings Pond Based on RSCIC
    Yu, Guangming
    Yu, Yingnian
    Liu, Junwei
    Qiu, Ju
    Zuo, Yanhua
    Zeng, Xiankun
    Dong, Xin
    Wang, Weiquan
    [J]. 10TH INTERNATIONAL CONFERENCE ON MECHATRONICS AND MANUFACTURING (ICMM 2019), 2019, 635
  • [10] Research on establishment and structure of guaranty funds system for safety and environment restoration and control of tailings pond
    Shen Louyan
    Zhou Keping
    [J]. DISASTER ADVANCES, 2012, 5 (04): : 1529 - 1533