Integrated forest harvest planning and road-building model with consideration of economies of scale

被引:3
|
作者
Mobtaker, Azadeh [1 ,3 ]
Montecinos, Julio [1 ]
Ouhimmou, Mustapha [1 ]
Ronnqvist, Mikael [2 ]
机构
[1] Ecole Technol Super, Syst Engn Dept, Montreal, PQ, Canada
[2] Univ Laval, Mech Engn Dept, Quebec City, PQ, Canada
[3] CanmetENERGY, Nat Resources Canada, Varennes, PQ, Canada
关键词
tactical forest management; integrated model; harvest planning; road building; economies of scale; OPTIMIZATION; SYSTEM;
D O I
10.1139/cjfr-2019-0380
中图分类号
S7 [林业];
学科分类号
0829 ; 0907 ;
摘要
We consider the problem of tactical forest management over a 5-year horizon with yearly periods. The main decisions made consider which harvest areas to cut in each period, the flow of timber from an area to each wood-processing mill to satisfy its annual demand, and which roads to build to access a harvest area not connected to the existing road network. The goal is to minimize the total transportation and road-building costs subject to budget limitations. To explore the benefits of economies of scale (EOS) in road construction, we incorporated this notion in the proposed model. Then, the efficiency of the obtained solution is compared with the model without EOS. The proposed model is a mixed-integer linear program, including several timber assortments and multiple periods. We validated the model for a realistic case in the context of the province of Quebec. The results demonstrate that consideration of EOS significantly reduces the total cost by about 5.3%. In the EOS solution, the road segments that are built every year are very concentrated in specific parts of the region, allowing a road-building company to take advantage of EOS. Moreover, this solution provides a much more efficient timber transportation plan.
引用
收藏
页码:989 / 1001
页数:13
相关论文
共 50 条
  • [1] Estimating the impacts of harvest distribution on road-building and snag abundance
    DeLong, SC
    Fall, SA
    Sutherland, GD
    CANADIAN JOURNAL OF FOREST RESEARCH-REVUE CANADIENNE DE RECHERCHE FORESTIERE, 2004, 34 (02): : 323 - 331
  • [2] Forest harvest and sawmills: An integrated tactical planning model
    Fuentealba, Sebastian
    Pradenas, Lorena
    Linfati, Rodrigo
    Ferland, Jacques A.
    COMPUTERS AND ELECTRONICS IN AGRICULTURE, 2019, 156 : 275 - 281
  • [3] A Robust Model for Protecting Road-Building and Harvest-Scheduling Decisions from Timber Estimate Errors
    Palma, Cristian D.
    Nelson, John D.
    FOREST SCIENCE, 2014, 60 (01) : 137 - 148
  • [4] Scale models as an element of advertising construction and road-building equipment
    Bondar, V.N.
    Fedorov, V.V.
    Namukhanov, R.R.
    Stroitel'nye i Dorozhnye Mashiny, 2004, (05): : 45 - 47
  • [5] SPECIALITIES OF ROAD-BUILDING AND TRAFFIC-PLANNING IN FOOD INDUSTRIAL-PLANTS
    KISS, L
    ELELMEZESI IPAR, 1982, 36 (08): : 296 - 305
  • [6] FOREST HARVEST SCHEDULING PLAN INTEGRATED TO THE ROAD NETWORK
    Belavenutti, Pedro Henrique
    da Silva, Martins
    Arce, Julio Eduardo
    Loch, Gustavo Valentim
    David, Hassan Camil
    Fiorentin, Luan Demarco
    CERNE, 2016, 22 (01) : 69 - 75
  • [7] Integrated harvest and logistic planning including road upgrading
    Flisberg, Patrik
    Frisk, Mikael
    Roennqvist, Mikael
    SCANDINAVIAN JOURNAL OF FOREST RESEARCH, 2014, 29 : 195 - 209
  • [8] Strategic planning for optimization of road-building materials in Overberg District Municipality in South Africa
    van Zyl, Gerrie
    Fourie, Gerhard
    Henderson, Mervyn
    TRANSPORTATION RESEARCH RECORD, 2007, (1989) : 250 - 259
  • [9] Operational harvest planning under forest road maintenance uncertainty
    Gomes, Vanessa de Souza
    Monti, Cassio Augusto Ussi
    Silva, Carolina Souza Jarochinski e
    Gomide, Lucas Rezende
    FOREST POLICY AND ECONOMICS, 2021, 131
  • [10] Formulating the integrated forest harvest-scheduling model to reduce the cost of the road-networks
    Naderializadeh, Nader
    Crowe, Kevin A.
    OPERATIONAL RESEARCH, 2020, 20 (04) : 2283 - 2306